Town Planning Report 18 Taylor Court Cooroy Rev A (1)
Attached to the e-mail Fw_ Email 3 of 3 - DA lodgement - 18 Taylor Ct Cooroy Lot 2SP197518 - Combined MCU_ OPW_ RAL under CTS (Pt 3).msg.
Noosa Plan 2020: Amendment 2
Part 8 Overlays \ 8.2 Overlay codes \ 8.2.9 Regional Infrastructure Overlay Code
PO3 AO3.1
Development involving a sensitive land use is With the exception of class 10 buildings, buildings Not Applicable
sufficiently separated from major electricity associated with a sensitive land use maintain a
infrastructure and substations to minimise the setback of at least:
likelihood of nuisance or complaint. (a) 50 metres from a transmission substation;
(b) 10 metres from any other substation; and
(c) 30 metres from a transmission line easement.
AO3.2
Buildings are not located within an easement for a
distribution line.
PO4 AO4
Development adjoining substations are located and For development adjoining substations, noise Not Applicable
designed to avoid noise nuisance from infrastructure. emissions do not exceed 5db(A) above background
noise level at the sensitive receptor of a building
associated with a sensitive land use, measured in
accordance with AS1055.
PO5 AO5
Wherever practicable new lots and buildings are Buildings are orientated so that the majority of outdoor Not Applicable
orientated to avoid direct overlooking of electricity living areas and windows of habitable rooms face away
infrastructure. from towers or other major electricity infrastructure.
PO6 AO6
For sensitive land uses, there is sufficient space within A minimum 3 metres wide densely planted landscaped Not Applicable
the site to establish landscaping which substantively buffer is provided along the boundary adjoining the
screens and softens poles, towers, or other structures electricity infrastructure, including provision for
and equipment associated with major electricity advanced trees and shrubs that will grow to a minimum
infrastructure and substations. height of 10 metres.
Editor's note- Applicants may find guidance in Powerlink
Queensland's brochure "Using Vegetation to screen
transmission lines". Applicants should also note that
vegetation will need to maintain statutory clearances.
PO7 AO7.1
Vegetation does not pose a risk to the safety or Vegetation planted within the easement of an Not Applicable
reliability of electricity infrastructure. overhead powerline or, where there is no easement,
the area of influence of a powerline, has a mature
height of no more than 3.5 metres.
Print Date: 09/12/2025 Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Town Planning Report 18 Taylor Court Cooroy Rev A (1).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.