EARTHWORKS CODE
Performance outcomes Acceptable Outcomes Applicant’s Comments
development and future use of the land and putrescible or refuse material, vegetation, acid No fill is anticipated to be required for the
filling or excavation works do not result in the sulfate soils, building or construction material development.
contamination of land. or other material or contaminants.
AO6.2 Complies
The site is not on the contaminated land The site is not listed on a contaminated land
register. register.
Haulage activity and amenity
PO7
Haulage of material to and from a site No acceptable outcome provided Complies
ensures— Haul routes from trucks used to transport
material to and from the site will only use major
1. minimal disturbance to
roads as required.
neighbouring properties and
properties along the haulage route;
and
2. Council’s road infrastructure
including pavements is not
adversely affected.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix G - Code Responses.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.