EARTHWORKS CODE
Performance outcomes Acceptable Outcomes Applicant’s Comments
Extent of earthworks
PO8 AO8 Complies
The layout of the development provides All earthworks, including cut and fill batters, All earthworks will be contained within the
adequate, clearly defined and easily retaining walls and the like are contained within subject site.
accessible— the subject site.
1. on-site vehicle parking and
manoeuvring areas; and
2. loading and manoeuvring areas for
delivery and service vehicles.
Sloping sites
PO9 AO9 Performance outcome
On sloping sites development follows the Cut or fill is less than 1.5 metres in depth The proposed excavation will be required to be
natural landform wherever practical and relative to the natural ground level. undertaken on the sloping site. Excavation is
excavation or filling is minimal. likely to exceed 1.5m and will be undertaken in
accordance with the geotechnical report.
(Refer to Appendix E).
Infrastructure protection
PO10 Complies
Earthworks and vehicular access do not No acceptable outcome provided The construction of the proposed development
adversely impact on the capacity, operations will ensure the protection of all existing
and maintenance of existing infrastructure. services or public utilities.
Preview the original
The page text is free to read. Previews and downloads of original files need an account.
Log in to previewLog in to download the original (Appendix G - Code Responses.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.