Appendix G - Code Responses · MCU23/0070
EARTHWORKS CODE
Performance outcomes Acceptable Outcomes Applicant’s Comments
Environmental protection
PO11 Complies
Earthworks minimise any adverse impact upon No acceptable outcome provided All earthworks are to be undertaken under the
groundwater, watercourses, drainage lines, supervision of a RPEQ engineer and will
wetlands, and native vegetation. comply with conditions of approval, stormwater
management plan and erosion and
sedimentation control plan to be prepared
during the detailed design phase of the
Dams
AO12.1 development.
PO12
Where the site is in the Rural zone—
Dam location and construction does not impact
upon neighbouring properties or road reserves, Not applicable
1. the land has a slope of less than
in terms of— 25% (1:4);
2. the earthworks including cut and fill
1. hydrology;
batters and retaining walls are
2. alteration of existing overland flow
setback a minimum of 50 metres
paths and patterns;
from the property boundary; and
3. landslide or failure of dam wall;
3. the size of the lot is greater than 5
and effluent disposal areas.
hectares.
AO12.2
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Appendix G - Code Responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 634 KB (small file)
- File type
No other editions are linked here.