Appendix G - Code Responses
TRANSPORT CODE
Performance outcomes Acceptable Outcomes Applicant’s Comments
3. ensuring stock piling, storage and
vehicle parking occur outside the areas
of vegetation to be retained.
AO12.6
Not applicable.
Where clearance of habitat is unavoidable,
once the area disturbed by the works is re-
established, replacement habitat is planted in
proximity of the works to create native fauna
habitat suitable for the area and maintained for
the life of the works.
PO13 AO13 Not applicable.
Road infrastructure is constructed to minimise Road infrastructure is constructed in
adverse environmental impacts, including from accordance with Council’s Planning
run-off and erosion. Scheme Policy PSP6 Engineering Design
Standards – Roads, drainage and earthworks
External Works and Infrastructure
PO14 AO14 Complies.
Development is provided with external works— Where not already existing, the following Refer to the Engineering Report in Appendix
infrastructure components are provided at the C.
1. along the full extent of the frontage frontage of the site—
of the site to an appropriate
1. full width sealed road;
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix G - Code Responses.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.