Skip to the record
Accept no substitutions.

Original source · versioned page text

Appendix G - Code Responses

of 156
                                                               TRANSPORT CODE
Performance outcomes                                Acceptable Outcomes                              Applicant’s Comments
              standard having regard to the          2.   concrete kerb and channel where
              specified function of the road; and         appropriate;
        2. provided beyond the site’s                3.   forming and grading to footpaths;
              frontage if required.                  4.   vehicular kerb and footpath crossings;
                                                     5.   a constructed bikeway;
                                                     6.   a constructed footpath;
                                                     7.   a constructed carriageway;
                                                     8.   required alterations to public utility
                                                          mains, services or installations;
                                                     9.   construction of any required alterations
                                                          to public utility mains, services or
                                                          installations;
                                                     10. stormwater drainage works; and
                                                     11. installation of electrical conduits.

PO15                                                                                                 Complies.
Any alterations or repairs to infrastructure as a No acceptable outcome provided                     Any alterations and repairs will be undertaken
result of the development are made at no cost                                                        where necessary and at no cost to Council
to Council.                                                                                          (except for any trunk infrastructure works,
                                                                                                     which are anticipated to be offset against the
                                                                                                     relevant infrastructure charges).

PO16                                                                                                 Complies.
Road infrastructure is proven to be suitable for No acceptable outcome provided

Log in to download the original (Appendix G - Code Responses.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.