Appendix G - Code Responses
TRANSPORT CODE
Performance outcomes Acceptable Outcomes Applicant’s Comments
standard having regard to the 2. concrete kerb and channel where
specified function of the road; and appropriate;
2. provided beyond the site’s 3. forming and grading to footpaths;
frontage if required. 4. vehicular kerb and footpath crossings;
5. a constructed bikeway;
6. a constructed footpath;
7. a constructed carriageway;
8. required alterations to public utility
mains, services or installations;
9. construction of any required alterations
to public utility mains, services or
installations;
10. stormwater drainage works; and
11. installation of electrical conduits.
PO15 Complies.
Any alterations or repairs to infrastructure as a No acceptable outcome provided Any alterations and repairs will be undertaken
result of the development are made at no cost where necessary and at no cost to Council
to Council. (except for any trunk infrastructure works,
which are anticipated to be offset against the
relevant infrastructure charges).
PO16 Complies.
Road infrastructure is proven to be suitable for No acceptable outcome provided
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Appendix G - Code Responses.pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.