Skip to the record
Accept no imitations.

Original source · versioned page text

Attachment 1A - ChangeExistingApproval-132005 1550 03 - Stage 1

Attached to the e-mail MCU16/0075 Development Application - 90 Beach Road Noosa North Shore.

of 42

Page text read automatically using OCR, there may be inaccuracies

      Regular testing must be undertaken to ensure quality of supply is achievable &
      maintained.
      61.2. Samples for chemical analysis shall be taken prior to occupation the units and
            Leisure centre and thereafter annually, if any parameters are above drinking
            quality guidelines.
      61.3. Samples for bacteriological analysis shall be taken prior to occupation and
            thereafter at 12 months intervals, with results forwarded to Council.
      61.4. Should the results show non-compliance with the NHRMC guidelines to the
            detriment of human health, immediate action is to be taken to make the water safe
            to drink.
      Protecting the supply
      61.5. Installation of gutter guard, first flush or other suitable methods to reduce entry of
            organic matter and dust.
      61.6. The installation of mosquito control screening on all tank inlets and discharge
            pipes.
      Maintenance of the water infrastructure
      61.7. A program for the regular servicing of any equipment installed.
62.   Install grease arrestors on self help kitchen waste lines at the Leisure Centre before
      entering treatment plants.
63.   Council to receive service agents reports on treatment plant testing.
64.   Council requires full hydraulic drawings for approval prior to construction.
65.   All trade waste requirements complying with Council’s Trade Waste Policy and including
      pre-treatment devices, must be shown on hydraulic plans submitted to Council for
      approval prior to issuing the development permit for building work.
66.   Vehicular access shall be provided to each grease arrestor and/or pre-treatment device
      for cleaning and servicing by Council’s contractor, and must allow vehicles to enter and
      leave the site in a forward direction. Where access is restricted, a pump out line to an
      approved location is required.
Trade waste requirements must be in place, inspected and approved prior to operation.

ADDITIONAL CONDITIONS – 18 JUNE 2012

68    The shed shall have a minimum setback of 20 metres from the eastern boundary and
      shall be constructed in accordance with the Bushfire Management Plan for the site.

69.   The shed colour shall consist of muted earth tone/s drawn from the natural setting of the
      site.

70.   Development undertaken in accordance with this approval shall generally comply with
      the approved plans listed below

Log in to download the original (Attachment 1A - ChangeExistingApproval-132005 1550 03 - Stage 1.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.