ecoaccess

environmental licences and permits

Schedule A - Activity
Prevent and /or minimise likelihood of environmental harm

(A1-1) In carrying out the environmentaily relevant activities, the holder of this permit must take all
reasonable and practicable measures to prevent and / or to minimise the likelihood of
environmental harm being caused. Any environmentally relevant activity, that, if carried out
incompetently, or negligently, may cause environmental harm, in a manner that could have been
prevented, shail be carried out in a proper manner in accordance with the conditions of this
permit.

NOTE: This permit authorises the environmentally relevant activity. It does not authorise
environmental harm unless a condition contained within this permit explicitly authorises that ~
harm. Where there is no condition or the permit is silent on a matter, the lack of a condition or
silence shall not be construed as authorising harm.

Maintenance of measures, plant and equipment
(A2-1) The holder must: ,
i. Install all measures, plant and equipment necessary to ensure compliance with the
conditions of this permit; and
ii. | Maintain such measures, piant and equipment in a proper and efficient condition; and
iii, | Operate such measures, plant and equipment in a proper and efficient manner.

Alterations

(A3-1) No change, replacement or operation of any plant or equipment is permitted if the change,
replacement or operation of the plant or equipment increases, or is likely to substantially.
increase, the risk of environmental harm above that expressly provided by this permit.

An example of a substantial increase in the risk of environmental harm is an increase of 10% or
more in the quantity of the contaminant to be released into the environment.

Calibration :
(A4-1) All instruments and devices used for the measurement or monitoring of any parameter under
any condition of this permit must be appropriately calibrated, operated and maintained.

 

Display of permit .

(A5-1) A copy of this permit must be kept in a location readily accessible to personnel _
carrying out the activity.

* Permit includes licences, permits, permits, authorisations, certificates, sanctions * Page 4 of 24

or equivalent/similar as required by legislation administered by the
Environmental Pratection Agency and the Queensiand Parks and Wildlife Service

Environmental Protection Agoncy Queensland Government
Wenw.epa.gid.gov.au ssnar 221 150 208 ae ae ene ae elie Lert

Log in to download the original (Attachment 1A - ChangeExistingApproval-132005 1550 03 - Stage 1.pdf)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.