Record, compile and keep all monitoring results required by this permit and present this
information to the administering authority when requested, in a specified format.
Any record or document required to be kept by a condition of this permit must be kept at the
licensed place for a period of at least five (5) years and be available for examination by an
authorised person. Excluding any environmental monitoring results, the record retention
requirements of this condition will be satisfied if any daily and weekly records are kept fora
period of at least three (3) years and these records are then kept in the form of annual
summaries after that period,
Copies of any record or document required to be kept by a condition of this permit must be
provided to any authorised person or the administering autherity on request. Where the
administering authority requires this data to be provided in a specified format, for example, a
designated spreadsheet and charts, then the data must be provided in that format.
Acid sulphate soils (ASS)
{A9-1)
(A9-2)
“(A9-3)
(A9-4)
At least forty days prior to the commencement of disturbing, extracting, unearthing or drain
maintenance of any soils below 5 metres AHD, an Acid Sulphate Soil Investigation must be
completed and an Acid Sulphate Soil Investigation Report on this investigation provided to the
administering authority in accordance with the QASSIT Guidelines for Sampling and Analysis of
Lowland Acid Sulphate Soils (ASS) in Queensland or latest version.
The Acid Sulphate Soil Investigation report must provide information relating to the extent of any
acid sulphate soils potentially affected or disturbed by the activities, and if any such soils are
detected, the proposed management procedures, which must provide for the effective and
appropriate environmental management of the acid sulphate soils.
You must comply with the latest edition of the Queensland Environmental Protection Agency's
INSTRUCTIONS FOR THE TREATMENT AND MANAGEMENT OF ACID SULFATE SOILS,
produced by the Queensland Environmental Protection Agency in consultation with the
Department of Natural Resources and Mines and the Department of Primary Industries.
Acid sulphate soils must be managed such that contaminants are not directly or indirectly
released, as a result of the activity, to any waters or the bed and banks of any waters.
Erosion protection measures and sediment controls
(A10-1)
(A10-2)
Prior to any site clearing or construction, erosion protection measures and sediment controls must
be installed and thence maintained to effectively minimise any likelihood of erosion and release of
- -., Sediments from the premises during all site clearing, construction-and operation. Procedures must-
be implemented to check and, if necessary, repair or replace the erosion control and sediment
control structures after each rain event likely to adversely affect the efficiency of those structures.
The erosion control and sediment contro! structures must operate to prevent any material loss of
sediment from the premises to any stormwater drain, roadside gutter or waters.
* Permit includes licences, permits, permits, authorisations, certificates, sanctions Page 6 of 24
or equivalent/similar as required by legislation administered by the
Environmental Protection Agancy and the Queensland Parks and Wildlife Service
www.epa.qid.gov.au sen az 227 158 785 Queenstand Parks and Wildlife Service
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.