Original source · versioned page text
Attachment 1A - ChangeExistingApproval-132005 1550 03 - Stage 1
Attached to the e-mail MCU16/0075 Development Application - 90 Beach Road Noosa North Shore.
ecoaccess
environmental ficancos and permits
(F 10-3)
(F10-4)
{F10-5)
(F 10-6)
A copy of the Irrigation Management Plan must be kept at the licensed place.
The holder of this permit must not implement an Irrigation Management Plan or amend an
Irrigation Management Plan where such imptementation or amendment would result in a
contravention of any condition of this development permit.
The holder of this permit must submit details of any amendment to the Irrigation Management
Pian to the administering authority with the annual return which immediately follows the
enactment of any such amendment.
The irrigation of treated effluent must be carried out in a manner such that:
i. Vegetation is not damaged;
ii. Soil erosion and soil structure damage is avoided;
iii. There is no surface ponding of effluent; .
iv. Percolation of effluent beyond the plant root zone is minimised;
v. The capacity of the land to assimilate nitrogen, phosphorus, salts, organic matter as
measured by oxygen demand and water is not exceeded; and
vi. The quality of ground water is not adversely affected.
(F10-7)
Contaminant release area monitoring program
Crop cover must be regularly harvested and removed from the effluent disposal areas.
(F11-1) Prior to commencement of the activity the holder of this permit must develop, implement and
. submit to the administering authority a Contaminant Release Area Monitoring Program to
effectively monitor the condition of the land to which contaminants are released.
(F11-2) Monitoring required by condition (F11-1) shall include the taking of top soil and sub surface
samples from at least four (4) representative sites for the quality characteristics and at the
frequency specified in Schedule F Table 1.
Schedule F - Table 1
pH PH scale Annually
Total nitrogen mg/kg Annually
Total phospherous mg/kg Annually
Sodium absorption ratio Calculated Annually
Electrical conductivity uS/cm Annually
Exchangeable cations me/100g Annually
Potassium mg/kg Annually
Free chiorine mg/kg Annually
Total calcium mg/kg Annually
Total magnesium mg/kg Annually
Total sodium mg/kg Annually
(F11-3) The proposal for the Contaminant Release Area Monitoring Program must include but not be
limited to the following:
i, The locations of monitoring stations including soil types and depths; and
ii. The proposed vegetation characteristics to be monitored.
* Permit includes licences, permits, permits, authorisations, certificates, sanctions Page 17 of 24
or equivalent/similar as required by legislation administered by the
Environmenta! Protection Agency and the Queensiand Parks and Wildlife Service
Environmental Protection Agency Queensland Government
Environmental Protection
WWW. pa.gid.gov.aU Aen a7 221 158 760
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.