Attachment 1A - ChangeExistingApproval-132005 1550 03 - Stage 1
Attached to the e-mail MCU16/0075 Development Application - 90 Beach Road Noosa North Shore.
Lot Reconfiguration
45. For the purpose of these conditions, the following definitions apply: -
45.1. A Plan of Survey means the plan for the reconfiguration of a lot required to be
endorsed by Council pursuant to S3.7.1 of the Integrated Planning Act 1997.
45.2. A registered Professional Civil Engineer means an civil engineer who is listed
under the Institution of Engineers, Australia “National Professional Engineers
Register 3” (NPER 3) or an engineer who is registered in Queensland pursuant to
the Professional Engineers Act 1988.
45.3. Carparking area means a parking area as defined in the Schedule to the Shire of
Noosa Planning Scheme inclusive of manoeuvring areas and access from the
roadway.
45.4. The person acting on this permit means any person or company who
undertakes development pursuant to this permit.
45.5. AS 2890.1 – 1993 means Australian Standard for Off Street Carparking - AS
2890.1-1993.
45.6. Principal Contractor means the person nominated by the Applicant and
approved by the Manager - Land Development at a pre-start meeting as being
responsible for the major component of works associated with a Development
Permit for Operational Works of any works on the site.
46. The lot reconfiguration shall be in accordance with plan C589-06 dated 22/08/05 as
submitted by Wolter Consulting Group, except as modified herein.
47. Pursuant to Section 3.5.21(6) of the Integrated Planning Act 1997, the currency period is
four (4) years from the day this permit takes effect during which time all conditions must
have been complied with, operational works completed, and the Plan of Survey lodged
with the Council for endorsement.
48. In conjunction with the lodgement of the Plan of Survey for Council endorsement, legal
documentation shall be presented to Council and shall be submitted in the correct form
with the fees prescribed in Council's adopted fee schedule.
49. Pursuant to Section 3.7.3(c) of the Integrated Planning Act, all outstanding rates and
charges due and payable to Noosa Council in respect of the lots being reconfigured
shall be paid prior to endorsement of the Plan of Survey for each stage.
50. Prior to undertaking any excavation, the person acting on this permit shall contact public
utility service providers to ascertain the location of their underground services.
51. The person acting on this permit shall apply and obtain for all other necessary permits
including crane permits, road opening permits, hoarding permits, footpath occupation
permits and/or any other approvals required under any other Act.
52. The following steps shall be undertaken prior to commencement of any construction:-
52.1. The Principal Contractor shall give Council's Inspector seven (7) days' notice of
intention to commence works.
52.2. The Principal Contractor or any of his subcontractors shall not undertake any
works unless each contractor has public liability insurance in the sum of
$10,000,000 and copies of current public liability insurance policies are submitted
to Council’s inspector.
52.3. The Principal Contractor shall nominate a site representative and give a telephone
number that can reach the site representative at any time during a 24-hour day.