Original source · versioned page text
2016-02-02 I&S Committee - Item 4 - Attachment 1 - Noosa Traffic Study
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
5.5 Year 2036 capacity analysis – Peregian Beach South Capacity analysis under predicted year 2036 peak hour conditions for both the non-holiday and the holiday / special event periods indicates degrees of saturation (DOS) at strategic intersections within the Peregian Beach South area at peak times, with existing intersection configurations, as depicted in Figure 17. Figure 17: Year 2036 AM and PM peak hour Degrees of Saturation in Peregian Beach South The critical traffic related issues in this part of the network, without upgrading of that network, under projected 2036 traffic loadings are: (i) High traffic flows on David Low Way (ii) Heron St / David Low Way intersection (iii) David Low Way / Emu Mountain Rd intersection 14.s.53.7 Page - 36
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.