Original source · versioned page text
2021-10-18 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 18 OCTOBER 2021
Approved Plans – March 2020 Unit 19
Plan No. Rev. Plan, prepared
by
A09 Perspective views: south, west, north facing, prepared by 22 January 2021
Lisa Page
A10 Perspective views: south/east/north views, prepared by 22 January 2021
Lisa Page
A11 Section view-east facing, prepared by Lisa Page 22 January 2021
A12 External Material Finishes Palette by Lisa Page 22 January 2021
- Landscape Concept Design document including site plan -
and perspective, cross sections, look and feel and design,
prepared by Louise Custance
Approved Plans – 21 October 2021 Units 9-10 (Lot 30 SP307674)
Plan No. Rev. Plan, prepared by
SD.102 Proposed Holyman Unit 3D perspectives, prepared by N/D
Iss P2 Gerard Smith Design
SD.104 Site / Roof Plan, prepared by Gerard Smith Design Aug 2018
Iss P10
SD.201 Floor Plans, prepared by Gerard Smith Design Aug 2018
Iss P9
SD.501 Elevations proposed, prepared by Gerard Smith Design Aug 2018
Iss P9
SD.601 Cross Sections – Sheet 2, prepared by Gerard Smith Aug 2018
Iss P2 Design
SD.951 Overviewing Diagrams – Level 1, prepared by Gerard Aug 2018
Iss P9 Smith Design
SD.952 Overviewing Diagrams – Level 2, prepared by Gerard Aug 2018
Iss P9 Smith Design
C. Include the following additional conditions 37 - 44 to read as follows:
Additional Conditions specific for Lot 30 (and the use of Lots 7 & 11 for
construction and access) – 21 October 2021
Performance Bond - Planning
37. Security in the form of a cash bond or trading bank guarantee to the sum of $10,000
must be submitted to Council, to secure performance of all conditions of this
approval, specifically for Lot 30, prior to the issue of a Development Permit for
Building Works. The cash bond or trading bank guarantee will be returned on
performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit. Council reserves the right to call
upon the bond or guaranteed sum to effect compliance with conditions.
Performance Bond – Demolition
38. Security to the value of $10,000 must be provided to Council’s Building and
Plumbing Services prior to the issue of the development approval for building works
(demolition). The security must be in the form of a cash bond or bank guarantee,
for security against satisfactory completion of works.
Landscaping
39. The development site must be landscaped generally in accordance with the
approved plans and Planning Scheme Policy PSP2 – Landscaping, and the
Page 17 of 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.