GENERAL COMMITTEE MEETING MINUTES 18 OCTOBER 2021
8 T000054 – TEWANTIN BYPASS STAGE 1 INTERSECTION UPGRADE – TENDER
AWARD
Committee Recommendation
Moved: Cr Jurisevic
Seconded: Cr Lorentson
That Council note the report by the Designer Capital Works to the General Committee Meeting
dated 18 October 2021 and:
A. Award Contract T000054 for the construction of the Tewantin Bypass Stage 1 –
Intersection Upgrade works to SGQ Pty Ltd for the sum under a schedule of rates
contract for the amount of $5,052,575 excluding GST;
B. Approve expenditure under this Contract up to $7,849,520 excluding GST, including
contingency spend.
Carried unanimously.
9 MCU20/0037 – PLANNING & ENVIRONMENT COURT APPEAL NO. BD1074 OF 2021
– REFUSAL OF AN APPLICATION FOR MULTIPLE HOUSING – TYPE 2 DUPLEX AT
11 MARGIT CRES, SUNRISE BEACH
Committee Recommendation
Moved: Cr Lorentson
Seconded: Cr Stockwell
That Council note the report by the Manager Development Assessment to the General
Committee Meeting dated 18 October 2021 regarding Planning & Environment Court Appeal
No. BD1074 of 2021 and agree to settle the appeal generally in accordance with the following
conditions:
PLANNING
When Conditions must be Complied With
1 Unless otherwise stated, all conditions of this Decision Notice must be complied with
prior to the use commencing, and then compliance maintained at all times while the use
continues.
Approved Plans
2. Development undertaken in accordance with this approval must generally comply with
the approved plans of development. The approved plans are listed in the following table
unless otherwise amended by these conditions.
Plan No. Rev. Plan/Document Name Date
H Development Application/Development summary, prepared 03.09.2021
by OH Architecture
DA 001 H Proposed Plan, prepared by OH Architecture 3 September 2021
DA 101 H Proposed Basement Plan, prepared by OH Architecture 3 September 2021
DA 102 H Proposed Lower Floor Plan, prepared by OH Architecture 3 September 2021
DA 103 H Proposed Upper Floor Plan, prepared by OH Architecture 3 September 2021
DA 104 H Proposed Roof Plan, prepared by OH Architecture 3 September 2021
DA 151 H Proposed Elevations, prepared by OH Architecture 3 September 2021
Page 23 of 29
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.