Council archive · source document
08/0071 - Op Works - Driveway Access [As Published] · 142008.71
INTEGRATED PLANNING ACT 1997
IDAS Assessment Checklist, Version 21.0, 3 September 2007
EASEMENTS AND SUBSTATIONS
4.13
Is any of the proposed operational work for filling or excavation?
OONo (Yes
If yes, is the filling or excavation associated with reconfiguring a lot?
O Yes LJ No ~ Answer both (a) and (b) below
\
No
(a) 1s any part of the premises subject to an easement in favour of a distribution entity or transmission entity under the
Electricity Act 1994?
CNo O Yes
ifyes, is any of the operational work proposed to be located in any part of the easement?
Cl No Oo YS - This application must be referred to the entity as Advice Agancy.
(b) is any of the operational work proposed to be located within 10m of a substation site under the Electricity Act 1994?
No [1 Yes - this application must be referred to the entity responsible for the substation as Advice Agency.
IP Raguiadian. schedule 2, table 3 item tay IP Requisition. schedule 2, rably 3. item 10(b),
414
fs any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the Petroleum
Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
No (Yes
If yes, is any of the proposed operational work for filling, excavation, compaction, drilling, boring or piping, not associated with
reconfiguring 2 lot?
[LINo CI Yes
If yes, is any of the operational work proposed to be located in any part of the easement?
No oO Yes - This application must be referred to the licence holder as Advice Agency.
IP Regutetion, schedule 2, table 3, hem 17.
PUBLIC PASSENGER TRANSPORT:**
aia
41.5
|s any of the proposed operational work listed in schedule 13C of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
LJ No L. Yes - This application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Regulation, schedule 2. tanle 2, item 14.
RAILWAY SAFETY:AND EFFICENCY:
Is any of the proposed operational work listed in schedule 130 of the integrated Planning Regulation 1098 and does it exceed the
416
specified threshold?
(J No (1 Yes - this application must be referred to Queensland Transport (QT) as Concurrence Agency.
IP Rogulation, schedule Z, table 3, item 14.
KOALA CONSERVATION. i : Bees a.
4.1.7 ||s any part of the premises in a koala conservation area or koala sustainabiliy area?
LNo 0 Yes
tyes, is all of the proposed operational work associated with a material change of use or reconfiguiing a lot for which referral
/. {$required in relation to koala conservation (i.e. did you answer ‘yes’ to all questions in either Q2,1.8 or Q 3.12)?
* DYes LNo
‘ Ifno, is the proposed operational work for a domestic activity, as defined by the Environmental Protection Act 1994?
* (C)Yes DNo
M If no, will the activity result in the following?
¢ — Clearing of native vegetation over an area greater than 2,500m? CONo {Yes
e — Extracting gravel, rock or sand from an area greater than 5,000m2 CJNo (Yes
* — Excavating or filling an area greater than 5,000m?2 Ono Yes
If yes to one or more - This application must be referred to the Environmental Protection Agency (EPA) as Concurrence Agency.
IP Reguiation, schedule 2, tabie J, item 1s,
WILD RIVER AREA - = Although legistation provides for: assessment of Gperational works for residential, commerciat and industial development for they purposes of the
Wild Rivers Act 2005, currently no.deciarations for any of the.wild river areas apply the Wild Rivers code to that type of development. *
Page 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
08/0071 - Op Works - Driveway Access [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.