Skip to the record
For the highest quality transcripts.

Council archive · source document

08/0071 - Op Works - Driveway Access [As Published] · 142008.71

of 58

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

 

INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 21.0, 3 September 2007

 

WATERWAY BARRIER WORKS; WILD-RIVER AREA

4.12. ||s anyfof the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
Wo DL Yes \
If yes, is any of the proposed operational work to be. carried out in a wild river area declared under the Wild Rivers Act 2005?
(No
{f no, is all of the operational work for constructing or raising waterway barrier works -
¢ — intended to exist for no more than 28 days; and
«built or raised in freshwater; and
¢ no more than. 20m in length and no more than 3m in height from the lowest point on the stream bed?

C1 Yes CINo

If no, is all of the operational work for constructing or raising waterway barrier works -
« more than 100km from the coastline; and
in the smallest unbranched tributary of a catchment or a stream into which that tributary flows

oO Yes oO No - (Complete Form 1, Part O3) This application requires assessment by the Department of Primary Industries and
Fisheries (DPI&F). If DPI&F is not the Assessment Manager for the application, the agency has jurisdiction as Concurrence
Agency.

 

 

(Yes

If yes, is any of the proposed operational work to be carried out in a wild river high preservation area?

No:- Uniess the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive
it (Complete Form 1, Part Os} This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). and,
subject fo the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.

Oo Y@S - An application for the operational work would be taken to be nat property made and the Assessment Manager must refuse to receive it,

#2, table 4 tam 2:1P Regulation, scheatula 2. talks 2. tenn 20° 1P A

 
 

f

   

ton, schedule 1. part 3, table ¢, tent 6: Fisheries Act

 

| DECLARED FISH HABITAT AREA; WILD-RIVER AREA

 

 

4.13 || anyf the proposed operational work to be carried out completely or partly within a declared fish habitat area under the Fisheries .
Act £994.
aps (Yes
If yes, indicate what the operational work is reasonable necessary for (Tick applicable box/es) ; ‘2
¢» The maintenance of existing structures, including for example the following structures, if the structures [1 No, (1 Yes won
. were constructed in compliance with all the requirements, under any Act, relating to a structure of that % ”

type — * '
« Boat ramps, boardwalks, drains, fences, jetties, roads, safety signs, swimming enclosures & weirs; ‘
« Existing powerlines or associated powerline infrastructure

* — Educational or research purposes relating to the fish habitat area [CNo [1)Yes

* — Monitoring the impact of development on the declared fish habitat area CNo (1 Yes

¢ — Other purposes ONo (Yes
If yes to Other purposes’, is that proposed operational work to be carried out in a wild river area declared under the Wild
Rivers Act 2005?

oO No- (Complete Form 1, Part O:) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). If DPI&F is not the
Assessment Manager for the application, the agency will have jurisdiction as Concurrence Agency.

C1 Yes

If yes, is all of the proposed operational work for specified works under the Wild Rivers Act 2005?

oO Yes - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to receive
it (Completa Farm 1, Part O2) This application requires assessment by the Department of Primary Industries and Fisheries (DPI&F} and
assessment for the purposes of the Wild Rivers Act 2005. If DPI&F is nol the Assessment Manager for the application, the agency has
jurisdiction as Concurrence Agency.

CNo

If no, is any of the proposed operational work to be carried out in a wild river high preservation area?
oO No - Unless the application is consistent with any property development plan applying to the land, the Assessment Manager must refuse to
receive it. (Complete Form 1, Part O2} This application requires assessment by the Department of Primary Industries and Fisheries
(DPI&F) and, subject to the declaration for the relevant wild river area, assessment for the purposes of the Wild Rivers Act 2005. If DPIRF
58 not the Assessment Manager for the application, the agency has jurisdiction as Concurrence Agency.
O Yes - An application for the operational work would be taken to be not properly made and the assessment manager must refuse to receive
the application.

 
 

PA,
2208, §

   

2, dein 25: 1F Reguiation, schedule 1, part J, lable 4, dae 7: Wiki Riveis Att

 

 

 

 

Page 29

Used in these records

About this file

File size
4.9 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

08_0071 - Op Works - Driveway Access [As Published].pdf · 4.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.