2017-11-13 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 13 NOVEMBER 2017
b. a total of 12 bicycle parking spaces
c. end of trip facilities involving 12 lockers, 1 male and female shower and
change rooms.
Public Safety
19. All ground floor shopfront glazing must be protected against vandalism by the
use of a form of safety glass such as toughened or laminated glass.
20. During operating hours, all parking areas, pedestrian areas and entrances/exits
to all stairwells, foyers and public toilets must be well lit with vandal resistant
lighting and with intensities to satisfy the requirements of Australian Standard
AS1158 “Public Lighting Code”. Lighting must be designed to reduce the contrast
between shadows and well lit areas. In particular, appropriate security lighting
must be provided in the location shown at the corridor servicing the toilets and
change room.
Electricity and Telecommunication Services
21. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
22. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Easements
23. Unless otherwise agreed in writing by the relevant service provider, any public or
third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
24. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
25. All works must be kept clear of any existing or proposed easements on the
subject land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
26. All fill and associated batters must be undertaken in accordance with an
Operational Works approval, and contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council.
27. All retaining walls must be designed and constructed in accordance with the
planning scheme and must be certified by an RPEQ where exceeding 1.0m in
height. All retaining walls that are publicly accessible and exceed 1.0m in height
must be fitted with a commercial grade safety fence.
Damage to Services and Assets
28. Any damage caused to existing services and assets as a result of the
development works must be repaired at no cost to the asset owner at the
following times:
Page 10 of 22