Original source · versioned page text
2017-11-13 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 13 NOVEMBER 2017
31. All landscape works must be maintained generally in accordance with the
approved design for the life of the development.
Stormwater Drainage
32. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval and be generally in accordance with the submitted
Stormwater Management Plan - Revision A dated 19 April 2017, prepared by
Switchback 48 Consulting.
33. Stormwater runoff from the development must be disposed of on-site without
causing scour or damage to the subject site or any adjoining property. Plans
submitted for the Operational Works approval must include calculations in
accordance with Queensland Urban Drainage Manual for any overland flow
discharge areas to confirm that scour will not result from the development.
34. A stormwater quality treatment system must be provided for the development.
The works must be undertaken in accordance with an Operational Works
approval and the Bio-retention Technical Design Guidelines (Water by Design,
2012), and must include in particular:
a. stormwater quality treatment devices of a size and location of 30m2 plus
25m2 generally in accordance with those shown in section 2 of the of the
Stormwater Management Plan for 11-19 Hilton Terrace Tewantin by
Switchback Consulting, dated 19 April 2017.
b. Bio-retention devices which:
i. are designed generally in accordance with the Water by Design
Technical Design Guidelines for bio-retention basins
ii. are provided with a free-draining outlet from the sub-soil drainage
system
iii. swales which are designed in accordance with the Water Sensitive
Urban Design Technical Design Guidelines for South East
Queensland
iv. have batters around the entire perimeter, or where demonstrated that
is not feasible, have retaining structures only of the maximum size
recommended within the Water by Design Technical Design
Guidelines for bio-retention basins.
35. All stormwater quality treatment devices must be maintained in accordance with
the Water by Design (2009) - Maintaining Vegetated Stormwater Assets (Version
1). A copy of this document must be retained on the site together with the
approved Operational Works drawings for the stormwater quality treatment
system and a detailed life cycle costing of the system attached as an addendum.
Records of all maintenance activities undertaken must be kept and made
available to Council upon request.
36. Any proposed Community Management Statement required for the development
must include the Water by Design (2009) – Maintaining Vegetated Stormwater
Assets (Version 1) document and must include the full cost of maintaining the
system in accordance with that document.
Page 12 of 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.