Original source · versioned page text
2017-11-13 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 13 NOVEMBER 2017
Service Vehicles
16. Service vehicle parking, manoeuvring and standing spaces must be provided on
the site. The works must be undertaken in accordance with an Operational Works
approval and must include in particular:
a. regular access for a Waste Collection Vehicle
17. Service vehicle movements associated with the approved use (including loading
and unloading) must not occur outside the hours of 6am to 6pm Monday to
Saturday and not at all on Sundays or public holidays. The requirements of this
condition must be included in the Community Management Statement for any
body corporate for the subject site.
Pedestrian and Bicycle Facilities
18. Pedestrian and bicycle facilities must be provided for the development. The
works must be undertaken in accordance with an Operational Works approval
and must include in particular:
a. Internal pedestrian footpaths in accordance with the approved plans
b. a total of 12 bicycle parking spaces
c. end of trip facilities involving 12 lockers, 1 male and female shower and
change rooms.
Public Safety
19. All ground floor shopfront glazing must be protected against vandalism by the
use of a form of safety glass such as toughened or laminated glass.
20. During operating hours, all parking areas, pedestrian areas and entrances/exits
to all stairwells, foyers and public toilets must be well lit with vandal resistant
lighting and with intensities to satisfy the requirements of Australian Standard
AS1158 “Public Lighting Code”. Lighting must be designed to reduce the contrast
between shadows and well lit areas. In particular, appropriate security lighting
must be provided in the location shown at the corridor servicing the toilets and
change room.
Electricity and Telecommunication Services
21. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits
and pipes to accommodate the future connection of optic fibre technology
telecommunications.
22. Certification must be submitted to Council from all relevant service providers
which certifies that the development has met the requirements of this Decision
Notice and all applicable legislation at the time of construction.
Easements
23. Unless otherwise agreed in writing by the relevant service provider, any public or
third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
Page 17 of 22
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.