2017-11-13 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 13 NOVEMBER 2017
5. The new road must terminate in a cul-de-sac with a circular turning area of sufficient
size to accommodate the single forward motion turn of a Waste Collection Vehicle
(WCV) clear of private driveways on-street parking and speed control devices or if the
adjoining property to the east (No 28 Elkhorn Drive - Lot 70 M37807) has been
developed the “access” road formation must extend to and match smoothly with the
existing formation within Lot 70 M37807, whichever is applicable at the time of
construction.
External Works
6. Access to proposed Lots 7 and 8 must be from the Road 86419 frontage only (northern
boundary) and the approved plans amended accordingly. The works must be
undertaken in accordance with an Operational Works approval and must be
constructed prior to the sealing of the survey plan. The works must include in particular:
a. a half road construction consisting of 3m wide seal, kerbing and channelling and
extending from the Tait Street formation for a distance of 40 metres from Tait
Street (western boundary of Lot 6) terminating in a temporary turnaround;to the
eastern boundary of proposed Lot 8
b. the intersection with Tait Street;
c. the northern half of the new road constructed with a gravel formation;
d. the realignment of the existing vehicle track to join to the end of the southern half
of the new road;
e. the removal of the redundant sections of the existing vehicle track and the areas
turfed or grass seeded;
f. the construction of the vehicle access to proposed Lots 7 and 8.
Stormwater Quantity
7. The new stormwater works must be constructed in accordance with the approved plans
and the works must be undertaken in accordance with an Operational Works approval.
8. The stormwater elements of the development, including the basin at 14 Eagle Drive,
are to be built in accordance with the BSM stormwater report Detailed Design of
Stormwater Detention Volume dated 18.09.2017, letter from BSM dated 13.10.2017,
letter from Haynes Consulting Engineers dated 11.10.2017 and accompanying plans.
Where design elements will be finalised at a later stage, these will be in accordance
with the relevant codes, standards, guidelines and Council’s requirements.
9. All basin retaining structures are to be structurally certified to Council’s design life as
part of operational works design and certification is to be provided to Council prior to
plan sealing.
10. Appropriate protection will be provided against scour at basin inflow and outflow points.
Stormwater Quality
11. Prior to Council accepting water quality treatment device assets “Off Maintenance”, the
applicant must provide Council with a Schedule of Maintenance Costs for all activities
undertaken to maintain the bio retention basins in accordance with the most current
version of Healthy Waterways Bio-retention Basin Maintaining Vegetated Stormwater
Assets Guidelines. The schedule shall include records of actual costs of maintenance
work undertaken.
Page 2 of 22