2017-11-13 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 13 NOVEMBER 2017
ii. are provided with a free-draining outlet from the sub-soil drainage
system
iii. swales which are designed in accordance with the Water Sensitive
Urban Design Technical Design Guidelines for South East
Queensland
iv. have batters around the entire perimeter, or where demonstrated that
is not feasible, have retaining structures only of the maximum size
recommended within the Water by Design Technical Design
Guidelines for bio-retention basins.
35. All stormwater quality treatment devices must be maintained in accordance with
the Water by Design (2009) - Maintaining Vegetated Stormwater Assets (Version
1). A copy of this document must be retained on the site together with the
approved Operational Works drawings for the stormwater quality treatment
system and a detailed life cycle costing of the system attached as an addendum.
Records of all maintenance activities undertaken must be kept and made
available to Council upon request.
36. Any proposed Community Management Statement required for the development
must include the Water by Design (2009) – Maintaining Vegetated Stormwater
Assets (Version 1) document and must include the full cost of maintaining the
system in accordance with that document.
37. The applicant must submit plans for approval with the operational works
application for the inclusion of educational signage or stencilling to be
incorporated within the development to ensure patrons are reminded to minimise
waste and place it in bins.
Stormwater Harvesting
38. Operating underground stormwater harvesting tanks must be provided for the
development. The tanks must be provided in accordance with an Operational
Works approval and must include in particular:
a. a total tank capacity of a size suitable to maintain expected non-potable
and outdoor uses for a 2 month period without rain.
b. a minimum catchment of 50% of the building roof area.
c. re-use of harvested rainwater for internal non-potable uses and outdoor
uses.
d. stormwater harvesting tanks are to be located to the rear of the building.
39. Certification must be submitted to Council from a qualified person which certifies
that the rainwater collection tank/s and associated reticulation has/have been
installed in accordance with the requirements of this Decision Notice.
Acid Sulfate Soils
40. All works must be carried out in accordance with an Acid Sulfate Soil and
Groundwater Management Plan for the development prepared by a suitably
qualified person and referenced in a Development Permit for Operational Works.
The Acid Sulfate Soil and Groundwater Management Plan submitted with the
application for Operational Works must detail:
Page 20 of 22