2017-11-13 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 13 NOVEMBER 2017
f. not restrict pedestrian access
Any estate entrance works must be undertaken in accordance with an Operational
Works approval.
Property Access and Driveways
19. A residential driveway must be constructed to each lot. The works must be undertaken
in accordance with an Operational Works approval.
20. The access driveways to service Lots 8, 20 and 21 must extend for the full length of
the access handle. The works must be undertaken in accordance with an Operational
Works approval.
21. Vehicle access to Lots 7 & 8 is are limited to the Road 86419 frontage only (northern
boundary). A clause must be included in the contract of sale for Lots 7 & 8 which
prohibits vehicle access being taken from Eagle Drive.
Pedestrian and Bicycle Facilities
22. Pedestrian and bicycle facilities must be provided for the development. The works must
be undertaken in accordance with an Operational Works approval and must include in
particular:
a. A 2 metre wide footpath within the road verge for the entire length shown on the
approved plans.
b. A 1.5 metre wide footpath must be provided on the northern side of the bio-basin
extending from Eagle Drive to Clarey Park and a pool fence must be provided
between the footpath and the bio-basin
Electricity and Telecommunication Services
23. Underground reticulated electricity and telecommunication services must be provided
to each lot in accordance with an approval for Operational Works and the standards
and requirements of the relevant service provider.
24. Unless otherwise stipulated by telecommunications legislation at the time of
construction, the development must be provided with all necessary conduits, pits and
pipes to accommodate the future connection of optic fibre technology
telecommunications.
25. Certification must be submitted to Council from all relevant service providers which
certifies that the development has met the requirements of this Decision Notice and all
applicable legislation at the time of construction.
Easements
26. A minimum 1.5 metre wide easement for drainage purposes must be registered against
the title/s of the burdened properties in favour of the benefitted properties over the
proposed easements identified on the Approved Plans. The easements must of
sufficient width to wholly encompass the drainage structures and the associated
overland flowpaths.
27. An easement for access and service purposes must be registered against the titles of
proposed Lot 21 in favour of proposed Lot 20
28. Unless otherwise agreed in writing by the relevant service provider, any public or third
party infrastructure located on the subject site must be placed within an easement
registered against the title of the property.
Page 4 of 22