2017-11-13 General Committee Meeting Notes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
RECOMMENDATIONS ONLY – NOT THE FINAL DECISION OF COUNCIL
GENERAL COMMITTEE MEETING 13 NOVEMBER 2017
29. All easements must be designed in accordance with the planning scheme and granted
at no cost to the Grantee. Where the Grantee is Council or a service authority, the
easement documentation must be in accordance with the Grantee’s standard
easement terms. Draft easement documentation must be submitted to Council for
endorsement.
30. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
31. All fill and associated batters must be undertaken in accordance with an Operational
Works approval, and contained entirely within the subject site unless written permission
from the respective landowner(s) is provided to Council.
32. All fill and associated batters must be contained entirely within the subject site unless
written permission from the respective landowner(s) is provided to Council. All
earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments.
Carried.
3 132005.220.05 & OPW12/0031.02 – APPLICATION FOR EXTENSION TO CURRENCY
PERIOD FOR A PRELIM. APPROVAL TO OVERRIDE PLANNING SCHEME,
DEVELOPMENT PERMIT TO RECONFIGURE A LOT & DEVELOPMENT PERMIT FOR
OPERATIONAL WORKS AT 70 CARPENTERS RD & 25 JARRAH ST, COOROY
Motion
Moved: Cr Stockwell
Seconded: Cr Jackson
That Council note the report by the Development Planner to the Planning & Environment
Committee Meeting dated 7 November 2017 regarding Application No. 132005.220.05 &
OPW12/0031.2 for an extension to the currency period for a Preliminary Approval to Override
the Planning Scheme (22 Village Industry lots), Development Permit to Reconfigure a Lot
(22 Village Industry Lots, a Balance Lot, Drainage Reserve & Park Lots) and a Development
Permit for Operational Works - Extension to Currency Period, situated at 70 Carpenters Road
and 25 Jarrah Street, Cooroy and:
A. Approve a change to Condition 11 of approval 132005.220.05 to read as follows:
11. The Preliminary Approval to Override the Planning Scheme and Development
Permit for Reconfiguring a Lot lapses if the works have not been completed by 8
October 20212019, unless an application to extend the currency period is
approved by Council.
B. Approve an amendment to section 3 of approval OPW12/0031.02 to read as follows:
“The currency period for this development approval is until 8 October 2021 2019 during
which time all works must be completed unless an application to extend the relevant
period is approved by Council.”
C. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Page 5 of 22