Council archive · source document
FURTHER REPORT - PEREGIAN ACTIVE STREET UPDATE · Attachment 2 - Coastal Pathway Stage 1 Diagrams
ARTIST IMPRESSION
informal through lane informal
parking parking
EXISTING
informal through lane informal
parking parking
PROPOSED - TYPICAL
PROPOSED - DIVERSION TYPE 1 (PROTECTED ON-ROAD PEDESTRIAN LANE)
PROPOSED - DIVERSION TYPE 2 (KERB REALIGNMENT)
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
FURTHER REPORT - PEREGIAN ACTIVE STREET UPDATE · Attachment 2 - Coastal Pathway Stage 1 DiagramsAttachmentsMeeting 968 · read item & discussion ↗
About this file
- File size
- 3.3 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.