TPC 1947 - Approval Letter
Demagogue Pty. Ltd. - TPC 1947 - 17th December, 1987 - Page 5
17,
18.
19,
20.
The . applicant through his... solicitor. shell provide Council with an
appropriate indemity to indemnify Council against all possible claims
resulting from Land: ‘Slips occurring durin ig: constriction works: ‘upon the |
site, | Such indemnity ‘shall Be effective until- works upon ‘the site’
have .been certified as completed and having been carried out in
e@ccordance with the Developer's Geotechnical Engineer's requirements
by Council's Building Surveyor and Shire Engineer.
No trees or vegetation are to be removed from the site without the
approval of the Building Surveyor and the applicants' Geotechnical
Engineer. Written advice from the applicants Geotechnical Engineer
that removal of specific vegetation will have no detrimental effect on
the stability of the slope will be required prior to the Building
Surveyor's consideration of approval. No disturbance of the
vegetation below the building site except for construction of the
retaining wall as required by the conditions of this approval shall be
carried out unless specifically approved by the Shire Efgineer.
No earthworks or filling shall be carried out on the site until the
issue of building approval.
Prior to the submission of a building application and at the
applicant's expense a Geotechnical Report is to be submitted and
approved by Council's Geotechnical Consultants and Council's Building
Surveyor. Such report shall include a detailed assessment of the
following matters :- .
i. Identification of type of failures of the steep dune slopes that
May occur. .
ii. Guidelines for establishment of foundation levels having regard
to the requirement that all structures on the site. are to be
self-supporting in the event of a future sand slip.
iii. Construction factors including site supervision, storeage of
materials, limits to area of operation of machinery, piling
techniques, removal of vegetation and revegetation.
iv. A detailed assessment of the structural adequacy of all proposed
retaining walls on the site in the event of possible land slip.
Vv. Drainage of the site during construction having regard to the
requirement that no discharge of stormwater is permitted on the
dunal slopes during or after construction works.
vi. Design details for the retaining wall in Noosa Drive as required
under Condition 1f4(a).
vii. Design details for the suspended walkway as required under
Condition 14(g).