(ad) The applicant shall construct 6 stormwater drainage system which
° provides for the carrying off of all stormwater from the site
. including that:.from. roofed and_- paved. areas and .the frontage. -
Po an roadworks fequired in’ the Picture..'Point road‘ reserve: “The:
: stormwater drainage ‘system shall connect to Council's existing
culverts north of the site under Noosa Drive. ,
In designing the’ system the developer ‘shall have regard to
Council's requirement that minimal disturbance to the existing
vegetation is to be carried out within the Edger Bennett Avenue
road reserve and in this regard consideration shall be given to
designing the stormwater drainage system to be suspended under
the proposed walkway. It is to be noted that the design shall
consider the effects of likely land slips and shall inelude the
provision of flexible couplings as required to reduce possible
damage to the drain line. :
(e}) The applicant shall upgrade the existing Picture Point road
construction across the frontage of the site. Such works shall
include the provision of a 3 point truck maneouvre area. All
retaining structures necessary for the construction of these
works shall be at the full expense of the Developer. a
(£) The applicant shall connect to Council's existing sewerage
reticulation system at a point nominated by the Shire Engineer.
This shall include an extension to Council's system at the
, Applicant's expense. The construction methods for the sewer
. extension may be similar to the stormwater drainline connection
ie. suspended under the walkway with necessary precautions taken
to reduce damage to the sewer line in the event of land slip. An
alternative may be considered involving a pump station and rising
main to connect to the existing services in Picture Point.
{g) The applicant shall construct a suspended pedestrian walkway
within the Edgar Bennett Avenue road reserve to link Picture
Point to the existing walkway in Noosa Drive. The walkway is to
«be designed so as to ensure minimal effect on the existing
vegetation and shall provide sufficient -erosion controls as
required by the Shire Engineer. Revegetation of the road reserve’
is required following completion of construction works. The
walkway design shall provide for the suspension of stormwater and
sewer pipes leading from the site and shall be Gesigned to
withstand possible dunal failure.
15. The developer shall bear the cost of alteration of any public utility
or facilities necessitated by the development of the site or
associated construction works external to the site.
16, Any spill on or damage to Noosa Drive road reserve resulting from
construction works on the site shall be immediately removed by
Council, at the Developer's expense.