Skip to the record
Search everything, all in one place.

Original source · versioned page text

Refernce Documents - RAL25 0001

of 121

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Very large file (28.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.

                                       Table 5.2-4 Rational Method vs XP-Storm - Continued
                        Catchment      AEP     RM Pre    XP Pre   Difference   RM Post   XP Post   Difference
                                       63%      0.40      0.33       -0.07      0.40      0.33        -0.07
                                       39%      0.54      0.51       -0.03      0.54      0.51        -0.03
                                       18%      0.74      0.76        0.02      0.74      0.76         0.02
                             7         10%      0.89      0.89        0.00      0.89      0.89         0.00
                                        5%      1.06      1.10        0.04      1.06      1.10         0.04
                                        2%      1.33      1.33        0.00      1.33      1.33         0.00
                                        1%      1.52      1.53        0.01      1.52      1.53         0.01


                     The discharge results of the calibrated nodes are comparable to the Rational Method
                     calculations for each storm event examined and the model is considered appropriate for
                     use.



                     5.2.2 Model Results

                     The XP-Storm mean ensemble storm results have been compared for the post
                     development and pre developed scenarios.


                     Table 5.2.2-1 shows the pre development discharges for each of the modelled AEP
                     storm events and durations downstream of the Hoy Rd causeway crossing. The critical
                     peak discharge is highlighted for ease of reference. Table 5.2.2-2 shows the post
                     developed results following the propose works to the causeway.




                                                                                                           12
Document Set ID: 23448644
Version: 1, Version Date: 13/01/2025
Log in to download the original file

REFERNCE DOCUMENTS - RAL25 0001.pdf · 28.3 MB (very large file)

The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.