Original source · versioned page text
Refernce Documents - RAL25 0001
Very large file (28.3 MB): the original may take a few minutes to open or download. The page text below is quick to read.
Table 5.2-4 Rational Method vs XP-Storm - Continued
Catchment AEP RM Pre XP Pre Difference RM Post XP Post Difference
63% 0.40 0.33 -0.07 0.40 0.33 -0.07
39% 0.54 0.51 -0.03 0.54 0.51 -0.03
18% 0.74 0.76 0.02 0.74 0.76 0.02
7 10% 0.89 0.89 0.00 0.89 0.89 0.00
5% 1.06 1.10 0.04 1.06 1.10 0.04
2% 1.33 1.33 0.00 1.33 1.33 0.00
1% 1.52 1.53 0.01 1.52 1.53 0.01
The discharge results of the calibrated nodes are comparable to the Rational Method
calculations for each storm event examined and the model is considered appropriate for
use.
5.2.2 Model Results
The XP-Storm mean ensemble storm results have been compared for the post
development and pre developed scenarios.
Table 5.2.2-1 shows the pre development discharges for each of the modelled AEP
storm events and durations downstream of the Hoy Rd causeway crossing. The critical
peak discharge is highlighted for ease of reference. Table 5.2.2-2 shows the post
developed results following the propose works to the causeway.
12
Document Set ID: 23448644
Version: 1, Version Date: 13/01/2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.