Table 5.2.2-1 XP Storm Model Results — Pre Developed Case — Link 31
Duration 1%
10min 0.46
15min 1.63
20min 4.70
25min
30min
45min
ihr
1_Shr
2hr
3hr
4_Shr
6hr
Peak Discharge
Table 5.2.2-2 XP Storm Model Results — Developed Case- Link 31
2%
0.19
0.68
2.42
AEP — Discharge m3/s
5%
0.00
0.41
0.71
2.09
4.01
10%
0.00
0.13
0.50
0.67
1.34
18%
0.00
0.00
0.15
0.42
0.60
1.65
39%
0.00
0.00
0.00
0.00
0.10
0.49
0.67
1.45
2.81
AEP — Discharge m3/s
Duration 1% 2% 5% 10% 18% 39% 63%
10min 1.19 0.48 0.21 0.19 0.17 0.14 0.11
0.99 0.33 0.17 0.14 0.11
1.34 0.37 0.13 0.11
1.04 0.14 0.11
1.85 0.23 0.11
45min 8.03 6.53 5.18 4.30 3.06 1.24 0.10
dhr 8.03 6.64 5.41 4.26 3.57 2.06 0.49
1_Shr 748 6.40 5.32 4.46 3.84 2.53 1.39
2hr 6.82 5.76 5.37 4.60 3.65 2.53 1.73
3hr 6.63 5.54 5.29 451 3.91 2.89 2.06
4_Shr 5.95 5.16 4.96 4.17 3.76 2.80 1.99
6hr 6.46 5.59 4.62 3.78 2.88 2.09 1.55
Peak Discharge
Increase Pre vs Post
Reduction Pre vs Post
Table 5.2.2-3 shows a comparison of the critical peak discharges for the pre, post
development scenarios at downstream of the Hoy Rd crossing.
Document Set ID: 23448644
13
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.