                                             Officer:            Jack Lewis
                                             Direct Telephone:   (07) 5449 5294
                                             Response Address:   PO Box 141, Tewantin QLD 4565
                                             Email:              [email protected]
                                             Our Reference:      2004/4648
                                             Your Reference:
20 January 2009

Sunshine Coast Regional Council - Tewantin Office
CARE Mr Charlie Eames
PO Box 141
TEWANTIN QLD 4565



Dear Sir

                          Change to an Existing Approval
                                  Integrated Planning Act 1997

I refer to your request to make a change to an existing approval. On 15 January 2009 Council
decided your requested changes.
Details of the decision with the consolidated conditions are as follows:

1        APPLICATION DETAILS

    Application No:              2004/4648
    Street address:              6 Girraween Court, Sunshine Beach
    Real property description:   Lot 1 SP 208258
    Planning Scheme:             The Noosa Plan

2        DECISION DETAILS
Council on 24 February 2005 decided to issue the following type of approval:-
       Development Permit for Material Change of Use - Beach Volley Ball Courts
In relation to your request to extend the relevant period for the above development approval, Council
on 15 January 2009 decided to:
A.      Extend the relevant period until 24 February 2012
B.      Approve a change to Condition 9
C.      Issue a Change to an Existing Approval

3        RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.




                                                                                           Page 1 of 7
Full text of the other 6 pages

Page 2

                                                                                       2004/4648


4     ASSESSMENT MANAGER CONDITIONS
Land Use
1.    Development undertaken in accordance with this approval must generally comply with the
      approved plans of development. The approved plans are titled Site Plan 1, Court Details 2,
      Net Details 3 and Lighting and Fence Details 4 stamped and dated 24 February 2005 and
      approved plan titled Noosa Aquatic Centre (reflecting increased buffer zone) dated January
      1999 and prepared by Middap Ditchfield Architects and as may be amended by these
      conditions.
2.    The development must be undertaken and operated in a manner that causes no detrimental
      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
      lighting nuisance or other emissions.
3.    All development is to be clear of the buffer zones illustrated on the approved plans.
4.    Existing trees on the site and within road reserves are to be retained, except where to be
      removed due to building operations or the conduct of the approved use. All native vegetation
      within the buffer areas shown on the approved plans are to be protected.
5.    The operating hours of the beach volleyball courts is limited to school groups from 9am to
      2:45pm Monday to Friday whereby means of transport is to be arrange primarily around the
      use of buses and/or walking and cycling. Adult competition is limited to the hours of 6pm to
      9pm Monday to Friday.
6.    No more than 12 light poles shall be erected and each shall be at a maximum height of 15
      metres above the existing surface level.
7.    The night lighting is required to comply with Australian Standard 4282 1997 “Control of the
      obtrusive effects of outdoor lighting”, and Noosa Council Local Law 12 Division 3 Light
      Spillage.
8.    Cleared vegetation is to be suitably processed by one of the following methods and removed
      from the site:-
      8.1.   Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
             loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
             minimum of 10 metres between edges of heaps.
      8.2.   Disposal for firewood.
      8.3.   Disposal for landscaping purposes.
      8.4.   Transport to alternative site for breaking down materials provided that all necessary
             permits have been obtained to allow the alternate site to be used for this purpose.
      The disposal method for clearing works is to be submitted in conjunction with an application
      for a Development Permit for Operational Work. The Applicant is advised that other methods
      may be considered provided full details of the method are submitted.
      The Applicant is also advised that burning off is an unacceptable method of disposal.
9.    This development permit for Material Change of Use of Premises lapses if the use has not
      happened by 24 February 2012, unless an application is made to extend the currency, which
      is approved by Council.
Land Development
Vegetation Protection
10.   Prior to Operational Works approval a vegetation survey shall be undertaken in the new works
      area. If any Rare or Threatened (as per the Nature Conservation Act 1992) are identified, a
      management plan shall also be submitted detailing transplanting requirements and monitoring
      requirements.
                                                                                      Page 2 of 7

Page 3

                                                                                       2004/4648

Erosion and Sediment Control
11.    Any person acting on this permit shall prevent erosion and sediment export from leaving the
       site. Site control measures such as silt fencing, controlled gravel access to the site and
       controlled disposal of waste, will be necessary.
       In this regard plans detailing the methods of controlling erosion and sediment are required to
       be submitted to the Council for approval prior to obtaining a Development Permit for
       Operational Works.
General
12.    Any damage caused to any public utility during the course of construction shall be repaired to
       Council’s standards and at no cost to Council.
13.    Any alteration of any public utility or other facilities necessitated by the development of the
       land or associated construction works external to the site shall be at no cost to Council.
14.    The transportation of all materials to and from the site shall be undertaken in a manner such
       that no particle matter escapes onto a public road. All vehicles carrying materials either to or
       from the site shall be covered to prevent materials including dust being windblown from the
       vehicle.
Environmental Health
15.    The development must be undertaken and operated in a manner that causes no detrimental
       effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
       lighting, dust or odour nuisance or any other emissions in accordance with the nuisance
       provisions of the Environmental Protection Regulation 1998. On the spot fines apply for such
       offences.
5      REFERRAL AGENCY CONDITIONS

The referral agencies applicable to this application are:

 Referral Trigger            Referral Status     Referral Agency        Referral Address

 Nil

6      APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the Assessment
Manager conditions.

7      ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1.     Endangered, vulnerable or rare plants are protected under the Queensland Nature
       Conservation (Wildlife) Regulations 1994. Vegetation and Regional Ecosystems (R.E.s) are
       also protected under the Vegetation Management Act 1999. A permit will be required from the
       EPA to remove any rare or threatened plants prior to any development approval.
2.     Vegetation and Regional Ecosystems (R.E.s) are protected under the Vegetation
       Management Act 1999. The Department of Natural Resources & Mines will be required to be
       contacted for advice prior to development.
3.     Under the Environment Protection & Biodiversity Conservation Act (EPBC) permission is
       required from the Commonwealth Department of Environment to interfere with rare &
       threatened fauna & flora or habitat.

                                                                                      Page 3 of 7

Page 4

                                                                                          2004/4648

4.    The Environmental Protection Regulation 1998 and Local Law No.12 prohibit a builder from
      making noise from: -
      4.1.   Monday to Saturday, before 7:00am or after 6:30pm
      4.2.   Sunday or public holiday, at any time.
      A maximum penalty of $1,500 applies to an offence under these provisions
5.    In accordance with the Environmental Protection (Water) Policy 1997, all sand, silt, mud, paint,
      cement, concrete, builders waste or rubbish shall not be permitted to enter or be placed where
      it could reasonably be expected to move into a roadside gutter, stormwater drain or a water
      course. On the spot fines apply for such offences.
6.    We advise ‘interested parties’ i.e. ‘developer’, ‘owner’, ‘tenant’ to consider their responsibilities
      under the Disabled Discrimination Act (DDA) in regard to the installation of disabled access
      and the provision of disabled facilities, and that access to this building and the provision of
      sanitary facilities may need to comply with the requirements of Section D Part D3 and Section
      F Clause F2.4 of the Building Code of Australia.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.

8     PROPERTY NOTES
Not applicable

9     PRELIMINARY APPROVAL OVERRIDING SCHEME

Not applicable
10    FURTHER DEVELOPMENT PERMITS REQUIRED

 Type of Development Permit required           Subject of the required Development Permit
 Development Permit for Building Works         Beach Volley Ball Courts (Fence & Lighting)

 Development Permit for Operational            Landscaping, Clearing and Earthworks, Sediment &
 Works                                         Erosion Controls

11    SELF ASSESSABLE CODES
Not applicable

12    SUBMISSIONS

Not applicable


                                                                                         Page 4 of 7

Page 5

                                                                                    2004/4648


13     REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME

Not applicable

14     RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.

15     OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.

DECISION NOTICE HISTORY
 Original Decision Notice issued 24 February
  2005.
 Change to an Existing Approval issued 15
  January 2009 with amendment to Condition 9.
Yours faithfully,




Denis Wallace
PLANNING OFFICER




                                                                                   Page 5 of 7

Page 6

                                                                                                        2004/4648


                                                        Appeal Rights
                                                        INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                         (6) If an application involves assessment against a
Planning Act (Chapter 4).                                           concurrence agency code, appeal rights for submitters
                                                                    for the application are not available against the part of
Division 8 - Appeals to                court   relating   to        the approval that represents the concurrence agency’s
development applications                                            response for the code.
Appeals by applicants                                               Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application               4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following-               jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development           development approval for a development application if-
      application;                                                  (a) the development      application    involves   impact
(b) a matter stated in a development approval, including               assessment; and
      any condition applying to the development, and the            (b) the advice agency told the applicant and the
      identification of a code under section 3.1.6;1                   assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a                 application as a submission for an appeal.
      development permit was applied for;                              (2) The appeal must be started within 20 business
(d) the length of a relevant period;                                days after the day the decision notice or negotiated
                                                                    decision notice is given to the advice agency as a
(e) a deemed refusal.                                               submitter.
    (2) An appeal under subsection (1)(a) to (d) must be            Appeals for matters arising after approval given
started within 20 business days (the “applicant’s appeal
                                                                    (co-respondents)
period”) after the day the decision notice or negotiated
decision notice is given to the applicant.                          4.1.30.(1) For a development approval given for a
                                                                    development application, a person to whom any of the
    (3) An appeal under subsection (1)(e) may be started
                                                                    following notices have been given may appeal to the
at any time after the last day a decision on the matter
                                                                    court against the decision in the notice-
should have been made.
                                                                    (a) a notice giving a decision on a request for extension
Appeals by submitters
                                                                       of the relevanrt period for an approval;
4.1.28.(1) A submitter for a development application may
                                                                    (b) a notice giving a decision on a request to make a
appeal to the court about-
                                                                       minor change to an approval.
(a) the giving of a development approval, including any
                                                                        (2) The appeal must be started within 20 business
      conditions (or lack of conditions) or other provisions
                                                                    days after the day the notice of the decision is given to
      of the approval; or
                                                                    the person.
(b) the length of a relevant period for the approval.
                                                                        (3) Subsection (1)(a) does not apply if the approval
    (2) The appeal must be started within 20 business               resulted from a development application (superseded
days (the “submitters appeal period”) after the day the             planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to           application under a superseded planning scheme.
the submitter.
                                                                       (4) Also, a person who has made a request
    (3) If a person withdraws a submission before the               mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the               against a deemed refusal of the request.
decision.
                                                                       (5) An appeal under subsection (4) may be started at
   (4) If an application involves both impact assessment            any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are               should have been made.
available only for the part of the application involving
impact assessment.                                                  Division 9 - Appeals to court about other matters
    (5) If an application is processed under section                Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application         (no co-respondents)
are available only for the aspects of the development that          4.1.31.(1) A person to whom any of the following notices
would have required public notification under the                   have been given may appeal to the court against the
repealed Act.                                                       decision in the notice-
                                                                    (a) a notice giving a decision on a request to change or
                                                                       cancel a condition of a development approval.
1
    Section 3.1.6 (Preliminary approval may override local
    planning instrument)
                                                                                                       Page 6 of 7

Page 7

                                                                                                2004/4648

(b) a notice under section 6.1.442 giving a decision to      (c) the decision to give a preliminary approval when a
    change or cancel a condition of a development                  development permit was applied for;
    approval.                                                (d) the length of a period mentioned in section 3.5.21
    (2) The appeal must be started within 20 business              relevant period;
       days after the day the notice of the decision is      (e) a deemed refusal.
       given to the person.
                                                                 (2) An appeal under subsection (1)(a) to (d) must be
    (3) Also, a person who has made a request                started within 20 business days (the “applicant’s appeal
       mentioned in subsection (1)(a) may appeal to the      period”) after the day the decision notice or negotiated
       court against a deemed refusal of the request.        decision notice is given to the applicant.
    (4) An appeal under subsection (3) may be started at         (3) An appeal under subsection (1)(e) may be started
       any time after the last day the decision on the       at any time after the last day a decision on the matter
       matter should have been made.                         should have been made.
Appeals against decisions to change approval conditions      The Registrar for the Building and Development
under the repealed Act                                       Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision     http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or        For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court      4.1.36 Appeals about particular infrastructure
against-                                                     charges
(a) the decision; or                                         (1) This section applies to a person who has been
(b) a deemed refusal of the application.                     given, and is dissatisfied with, an infrastructure charges
                                                             notice or a regulated State infrastructure charges notice.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of      (2) The person may appeal to the court against the
the decision is to be given to the person.                   notice.
    (3) An appeal under subsection (1)(b) may be started     (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter      after-
should have been made.                                       (a) if the notice is given because of a development
Appeals against local laws                                        approval or master plan approval-the day the
                                                                  applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
                                                                  approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the           (b)    otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the   (4)    An appeal under this section may only be about-
planning scheme may appeal to the court against the
                                                             (a) whether a charge in the notice is so unreasonable
decision or the conditions applied.                              that no reasonable relevant local government, State
    (2) The appeal must be started within 20 business            infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the        have imposed it; or
applicant.
                                                             (b) an error in the calculation of the charge.
For Building Works Only                                      (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the           under this section can not be about the methodology
Integrated Planning Act 1997 as follows:                     used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to                charges schedule or regulated State infrastructure
development applications                                     charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
    application;
(b) a matter stated in a development approval, including
    any condition applying to the development, and the
    identification of a code under section 3.1.6;3


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
  Section 3.1.6 (Preliminary approval may override local
  planning instrument)
                                                                                               Page 7 of 7

Used in these records

About this file

File size
56 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Notice - Change to an Existing Approval - 010.2004.00004648.002 [As Published].pdf · 56 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.