Decision Notice - Change to an Existing Approval - 010.2004.00004648.002 [As Published] · 132004.4648.02
2004/4648
4 ASSESSMENT MANAGER CONDITIONS
Land Use
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development. The approved plans are titled Site Plan 1, Court Details 2,
Net Details 3 and Lighting and Fence Details 4 stamped and dated 24 February 2005 and
approved plan titled Noosa Aquatic Centre (reflecting increased buffer zone) dated January
1999 and prepared by Middap Ditchfield Architects and as may be amended by these
conditions.
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. All development is to be clear of the buffer zones illustrated on the approved plans.
4. Existing trees on the site and within road reserves are to be retained, except where to be
removed due to building operations or the conduct of the approved use. All native vegetation
within the buffer areas shown on the approved plans are to be protected.
5. The operating hours of the beach volleyball courts is limited to school groups from 9am to
2:45pm Monday to Friday whereby means of transport is to be arrange primarily around the
use of buses and/or walking and cycling. Adult competition is limited to the hours of 6pm to
9pm Monday to Friday.
6. No more than 12 light poles shall be erected and each shall be at a maximum height of 15
metres above the existing surface level.
7. The night lighting is required to comply with Australian Standard 4282 1997 “Control of the
obtrusive effects of outdoor lighting”, and Noosa Council Local Law 12 Division 3 Light
Spillage.
8. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
8.1. Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a
minimum of 10 metres between edges of heaps.
8.2. Disposal for firewood.
8.3. Disposal for landscaping purposes.
8.4. Transport to alternative site for breaking down materials provided that all necessary
permits have been obtained to allow the alternate site to be used for this purpose.
The disposal method for clearing works is to be submitted in conjunction with an application
for a Development Permit for Operational Work. The Applicant is advised that other methods
may be considered provided full details of the method are submitted.
The Applicant is also advised that burning off is an unacceptable method of disposal.
9. This development permit for Material Change of Use of Premises lapses if the use has not
happened by 24 February 2012, unless an application is made to extend the currency, which
is approved by Council.
Land Development
Vegetation Protection
10. Prior to Operational Works approval a vegetation survey shall be undertaken in the new works
area. If any Rare or Threatened (as per the Nature Conservation Act 1992) are identified, a
management plan shall also be submitted detailing transplanting requirements and monitoring
requirements.
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Notice - Change to an Existing Approval - 010.2004.00004648.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 56 KB (small file)
- File type
No other editions are linked here.