Skip to the record
Beware of cheap imitations.

Council archive · source document

Decision Letter - Change to an Existing Approval - 010.2008.00000746.002 [As Published] · 142008.746.02

of 7

Text shows just the words. Original shows the document exactly as it was published.

                                                Officer:          Mark Lewis
                                                Direct Telephone: (07) 5449 5176
                                                Response Address: Locked Bag 72
                                                                  Sunshine Coast Mail Centre QLD 4560
                                                Email:            [email protected]
                                                Our Reference:    2008/746
                                                Your Reference:

16 November 2009

Alan Becconsall & Associates
PO Box 2710
FORTITUDE VALLEY BC QLD 4006



Dear Sir / Madam

                          Change to an Existing Approval
                                   Integrated Planning Act 1997

I refer to your request to make a change to an existing approval. On 16 November 2009 Council
decided your requested changes.
Details of the decision with the consolidated conditions are as follows:

1        APPLICATION DETAILS

    Application No:               2008/746
    Street address:               14 Park Road NOOSA HEADS
    Real property description:    LOT: 3 RP: 122368
    Planning Scheme:              The Noosa Plan

2        DECISION DETAILS

Council on 26 August 2008 decided to issue the following type of approval:-
     Development Permit for Operational Works - Stormwater
In relation to the request to make a change to the existing approval, Council on decided to:
A.       Approve a change to the development approval with changes to Condition 2 and Item 6 -
         Approved Plans
B.       Issue a Change to Existing Approval.

3        RELEVANT PERIOD OF APPROVAL
This Development Permit lapses if the development has not happened by 26 August 2010 unless
application to extend the relevant period is approved by Council.

4        ASSESSMENT MANAGER CONDITIONS

1        The development shall be carried out in accordance with the approved plans listed below or as
         modified herein.
2        Roof and surface runoff connection to Council’s drainage system shall be as shown on Alliance
         Consulting Engineer’s Project # 07559 Drawings C01 - I and C02 - I.


                                                                                           Page 1 of 7
Full text of the other 6 pages

Page 2

                                                                                           2008/746

3    The stormwater connection shall be undertaken in accordance with an approved arborist’s
     report and the following requirements:
     3.1   The route for the trench shall be a minimum of 1.5 metres clear of all trees and shrubs
           unless otherwise agreed to by Council’s Chief Executive Officer (CEO).
     3.2   An arborist shall be on site all times supervising the works being undertaken.
     3.3   Prior to excavation existing mulch/leaf cover material over proposed trench shall be raked
           back and stockpiled for covering of trench area after completion.
     3.4   Works shall be undertaken in a progressive manner and the route reinstated as works
           progress.
     3.5   Uphill anchor roots of trees shall not be disturbed.
     3.6   All works shall be carried out by hand excavation other than the sewer trench under
           existing road pavement.
     3.7   All excavated material shall be placed on a ‘tarpaulin’ (or similar) alongside the proposed
           trench.
     3.8   Excavated material shall be used as bedding and backfilling of trench.
     3.9   Where works disturb the understorey vegetation, rehabilitation works shall be undertaken
           to the reasonable satisfaction of Council’s CEO.
4    Council’s Construction Technical Officer (ph 0410 512 505) shall be given seven (7) days’
     notice of intention to commence works to arrange a “pre start” meeting prior to the
     commencement of works.
5    The principal contractor must have all the appropriate insurance and public liability
     documentation to carry out the works. The principal contractor is also responsible to ensure that
     any sub contractors also have the appropriate insurance and public liability documentation.
6    Prior to the “pre start” meeting, the principal contractor must be provided with a copy of
     Council’s signed approved drawings and conditions by the applicant.
7    The Consulting Engineers for the project shall be currently Registered Professional Engineers
     of Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections
     with Council’s Construction Technical Officer or nominated staff. Council’s Construction
     Technical Officer shall provide an inspection form for signing off by the Engineer at appropriate
     stages of construction, during on-site meetings. Construction Technical Officer will also sign the
     form at each stage when requested conditions have been satisfied. The works will be accepted
     “On Maintenance” after this form, signed by the inspector for each stage is complete, together
     with a letter from the Engineer requesting that the works go “On Maintenance”.
8    Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
     project. (This person will be the contact for the project).
9    Council standards shall apply to these works unless otherwise modified herein.
10   The person acting on this permit shall ensure that its consultants and contractors take all
     reasonable care during the construction of the engineering works to ensure that Council
     property, road pavements or facilities (such as underground drainage, water supply, sewerage,
     footpaths, kerbing, landscaping, street furniture, etc.) are protected against any damage or
     interference whatsoever.
     If any Council property or facilities should be damaged by the Applicant or any of its Consultants
     or Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out
     the engineering works, the Applicant and/or its Contractors shall forthwith notify Council’s CEO
     and shall forthwith rectify the damage to that property or facility at its cost and to the satisfaction
     of Council’s CEO.


                                                                                        Page 2 of 7

Page 3

                                                                                         2008/746

     All rectification works are to be completed prior to the commencement of the use or,
     alternatively, the Applicant may request Council to carry out the rectification work at the
     Applicant’s cost, such cost being paid by the Applicant to Council prior to the commencement of
     the use.
     In the case of any emergency, Council shall be entitled to rectify such damage at the cost of the
     Applicant, such cost being paid prior to the commencement of the use.
11   The development of the site shall be carried out in such a manner as to prevent dust and/or
     sand nuisance to residents and/or tenants in the vicinity of the development.
12   Access to the site for all construction and associated works is to be from Allambie Rise. Access
     to the development site is not permitted from Park Road.
13   Construction work and other associated activities are permitted only during the hours of 7.00 am
     and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays, except
     where extended hours are approved by Council’s CEO or his nominee.
14   All signage, including that for safety during construction, shall be in accordance with the Manual
     of Uniform Traffic Control Devices and the Transport Infrastructure (Roads) Act.
15   Safe pedestrian access in the vicinity of the project shall be maintained at all times. If footpath /
     road closures are necessary to carry out construction works, Council’s Construction Technical
     Officer (ph 0410 512 505) must be notified prior to the proposed closure.
16   Sediment and erosion control measures must be in place prior to works commencing. If such
     measures are not in place or are not satisfactory, “on the spot “ fines may be issued. Such fines
     can be issued if sediments from the site are found to enter or have the potential to enter
     Council’s stormwater system or natural waterways. Although the sediment and erosion control
     measures have been approved on drawing C03/C Council’s CEO, may request further controls
     to be installed should approved measures be inefficient.
17   Because of the nature of the terrain, the stormwater drainage line shall be inspected by closed
     circuit television (CCTV) at the completion of all works and immediately prior to acceptance ‘On
     Maintenance’. Council’s Construction Technical Officer shall be advised of the timing of this
     inspection.
     A report of the CCTV inspection, including photographic records (which includes photos & video
     recordings burnt onto a CD) of the inspection shall be submitted to the Council for approval.
     Any defects or substandard works shall be recorded and accurately illustrated on the drainage
     plan showing the location of the defect(s).
     Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the applicants
     expense with a further CCTV inspection arranged once the rectification works have been
     completed.
     To this extent all CCTV inspections, including any additional inspections necessary following
     defect identification and rectification, shall be entirely at the applicant’s expense. Any costs
     incurred by Council in reviewing the CCTV inspection results shall also be borne by the
     applicant.
18   Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement
     of satisfactory “As Constructed” records shall be submitted to Council.
     As Constructed drawings and data shall be certified by a qualified experienced Civil
     Engineer(RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the
     location, level and type of all services and structures. All of which shall be submitted to Council
     for checking and for Council’s records.
     The data must fully detail levels for all engineering works including but not limited to drainage
     structures, finished ground levels and pavement surface levels. The data shall be submitted in
     the Asset Design and As Constructed (ADAC) digital format. Guidelines on the use of ADAC
     are available at www.adac.com.au and Council’s “Noosa Planning Scheme Policy 5 –
     Engineering Design Standards – Roads, Drainage and Earthworks”.
                                                                                       Page 3 of 7

Page 4

                                                                                           2008/746

      Approval of works shall not be granted until all As Constructed information has been supplied
      and accepted by Council.
19    A 5% cost of works to become Council assets or $1,500 bond (whichever is the greater) will be
      imposed on construction works during the maintenance period, which is a minimum period of 12
      months duration. Such bond must be lodged by, and shall only be accepted from the Developer
      for the works.
20    These works are also to be in compliance with the relevant conditions of Development Permit
      No. 23218 DA. In particular, all construction works on site shall comply with Condition 27 and 32
      of that permit with regards to Geotechnical Issues and the recommendations of the reports
      prepared by Golder Associates and Morrison Geotechnic pertaining to this development.
21    Notwithstanding that Council has checked the plans with due care, where it is found during
      construction that variations from Council's standards exist, then Council standards shall apply.

5     REFERRAL AGENCY CONDITIONS

Not Applicable.

6     APPROVED PLANS
The approved plans for this development approval are listed in the following table:

 Plan No.              Rev.    Plan Name                                                          Date
 07559 - C00             E     Locality Plan                                                      14/07/08
 07559 - C01             I     Stormwater Management Plan                                         10/11/09
 07559 - C02             I     Stormwater Long Section                                            07/10/09
 07559 - C03             E     Sediment & Erosion Control Details                                 14/07/08
 07559 - C-EX01          F     External Driveway Bulk Earthworks & Layout Plans and               10/11/09
                               Details

7     ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
Should any changes or modifications to the approved plans be required as a result of construction
constraints, a “Request to change an existing approval” (Form 2 Development Application) under the
Integrated Planning Act 1997 must be made. Amended plans clearly indicating the changes must be
lodged with this application along with the appropriate fees.
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not harm
Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural heritage
or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.



                                                                                         Page 4 of 7

Page 5

                                                                                      2008/746


8     PROPERTY NOTES

Not Applicable.

9     PRELIMINARY APPROVAL OVERRIDING SCHEME
Not Applicable.

10    FURTHER DEVELOPMENT PERMITS REQUIRED
Not Applicable.

11    SELF ASSESSABLE CODES

Not Applicable.

12    SUBMISSIONS
Not Applicable.

13    REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not Applicable.

14    RIGHTS OF APPEAL

You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.

15    OTHER DETAILS
<if applicable Please note that an Infrastructure Charge in accordance with the Coastal Major Road
Network Infrastructure Charges Plan has been triggered by the approval of this development
application. An Infrastructure Charge Notice is attached in compliance with Chapter 5 of the
Integrated Planning Act 1997.
Should you wish to obtain more information about Council’s decision electronic copies are available on
line at www.sunshinecoast.qld.gov.au, or at Council Offices.


Decision Notice History
26 August 2008 -           Original Decision Notice.
16 November 2009 -         Approved Change Conditions with amendments to Condition 2
                           and Item 6 – Approved Plans.


Yours faithfully




Ron Read
SENIOR ENGINEERING OFFICER
OPERATIONAL WORKS ASSESSMENT BRANCH




                                                                                    Page 5 of 7

Page 6

                                                                                                    2008/746


                                                    Appeal Rights
                                                    INTEGRATED PLANNING ACT 1997 & 1998 REGULATION




The following is an extract from the Integrated                      (6) If an application involves assessment against a
Planning Act (Chapter 4).                                        concurrence agency code, appeal rights for submitters
                                                                 for the application are not available against the part of
Division 8 - Appeals to                court   relating   to     the approval that represents the concurrence agency’s
development applications                                         response for the code.
Appeals by applicants                                            Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application            4.1.29.(1) An advice agency may, within the limits of its
may appeal to the court against any of the following-            jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development        development approval for a development application if-
      application;                                               (a) the development      application    involves   impact
(b) a matter stated in a development approval, including            assessment; and
      any condition applying to the development, and the         (b) the advice agency told the applicant and the
      identification of a code under section 3.1.6;1                assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a              application as a submission for an appeal.
      development permit was applied for;                           (2) The appeal must be started within 20 business
(d) the length of a relevant period;                             days after the day the decision notice or negotiated
                                                                 decision notice is given to the advice agency as a
(e) a deemed refusal.                                            submitter.
    (2) An appeal under subsection (1)(a) to (d) must be         Appeals for matters arising after approval given
started within 20 business days (the “applicant’s appeal         (co-respondents)
period”) after the day the decision notice or negotiated
decision notice is given to the applicant.                       4.1.30.(1) For a development approval given for a
                                                                 development application, a person to whom any of the
    (3) An appeal under subsection (1)(e) may be started
                                                                 following notices have been given may appeal to the
at any time after the last day a decision on the matter
                                                                 court against the decision in the notice-
should have been made.
                                                                 (a) a notice giving a decision on a request for extension
Appeals by submitters
                                                                    of the relevanrt period for an approval;
4.1.28.(1) A submitter for a development application may
                                                                 (b) a notice giving a decision on a request to make a
appeal to the court about-
                                                                    minor change to an approval.
(a) the giving of a development approval, including any
                                                                     (2) The appeal must be started within 20 business
      conditions (or lack of conditions) or other provisions
                                                                 days after the day the notice of the decision is given to
      of the approval; or
                                                                 the person.
(b) the length of a relevant period for the approval.
                                                                     (3) Subsection (1)(a) does not apply if the approval
    (2) The appeal must be started within 20 business            resulted from a development application (superseded
days (the “submitters appeal period”) after the day the          planning scheme) that was assessed as if it were an
decision notice or negotiated decision notice is given to        application under a superseded planning scheme.
the submitter.
                                                                    (4) Also, a person who has made a request
    (3) If a person withdraws a submission before the            mentioned in subsection (1) may appeal to the court
application is decided, the person may not appeal the            against a deemed refusal of the request.
decision.
                                                                    (5) An appeal under subsection (4) may be started at
    (4) If an application involves both impact assessment        any time after the last day the decision on the matter
and code assessment, appeal rights for submitters are            should have been made.
available only for the part of the application involving
impact assessment.                                               Division 9 - Appeals to court about other matters
    (5) If an application is processed under section             Appeals for matters arising after approval given
6.1.28(2), appeal rights for submitters for the application      (no co-respondents)
are available only for the aspects of the development that       4.1.31.(1) A person to whom any of the following notices
would have required public notification under the                have been given may appeal to the court against the
repealed Act.                                                    decision in the notice-
                                                                 (a) a notice giving a decision on a request to change or
                                                                    cancel a condition of a development approval.
1
    Section 3.1.6 (Preliminary approval may override local
    planning instrument)
                                                                                                  Page 6 of 7

Page 7

                                                                                                  2008/746

(b) a notice under section 6.1.442 giving a decision to      (c) the decision to give a preliminary approval when a
    change or cancel a condition of a development                  development permit was applied for;
    approval.                                                (d) the length of a period mentioned in section 3.5.21
    (2) The appeal must be started within 20 business              relevant period;
       days after the day the notice of the decision is      (e) a deemed refusal.
       given to the person.
                                                                 (2) An appeal under subsection (1)(a) to (d) must be
    (3) Also, a person who has made a request                started within 20 business days (the “applicant’s appeal
       mentioned in subsection (1)(a) may appeal to the      period”) after the day the decision notice or negotiated
       court against a deemed refusal of the request.        decision notice is given to the applicant.
    (4) An appeal under subsection (3) may be started at         (3) An appeal under subsection (1)(e) may be started
       any time after the last day the decision on the       at any time after the last day a decision on the matter
       matter should have been made.                         should have been made.
Appeals against decisions to change approval conditions      The Registrar for the Building and Development
under the repealed Act                                       Tribunal may be contacted at the website
4.1.33A.(1) A person who is dissatisfied with a decision     http://www.localgovernment.qld.gov.au/
made on an application to change the conditions
attached to an approval given under section 2.19(3)or        For Infrastructure Charges Only
section 4.4 of the repealed Act may appeal to the court      4.1.36 Appeals about particular infrastructure
against-                                                     charges
(a) the decision; or                                         (1) This section applies to a person who has been
(b) a deemed refusal of the application.                     given, and is dissatisfied with, an infrastructure charges
                                                             notice or a regulated State infrastructure charges notice.
    (2) An appeal under subsection (1)(a) must be
started within 20 business days after the day notice of      (2) The person may appeal to the court against the
the decision is to be given to the person.                   notice.
    (3) An appeal under subsection (1)(b) may be started     (3) The appeal must be started within 20 business days
at any time after the last day a decision on the matter      after-
should have been made.                                       (a) if the notice is given because of a development
Appeals against local laws                                        approval or master plan approval-the day the
                                                                  applicant is given notice of the decision about the
4.1.33B.(1) An applicant who is dissatisfied with a
                                                                  approval; or
decision of a local government or the conditions applied
under a local law about the use of premises or the           (b)    otherwise-the day the notice is given to the person.
erection of a building or other structure permitted by the   (4)    An appeal under this section may only be about-
planning scheme may appeal to the court against the
                                                             (a) whether a charge in the notice is so unreasonable
decision or the conditions applied.                              that no reasonable relevant local government, State
    (2) The appeal must be started within 20 business            infrastructure provider or coordinating agency could
days after the day notice of the decision is given to the        have imposed it; or
applicant.
                                                             (b) an error in the calculation of the charge.
For Building Works Only                                      (5) To remove any doubt, it is declared that an appeal
Rights of appeal conferred by Section 4.2.9 of the           under this section can not be about the methodology
Integrated Planning Act 1997 as follows:                     used to establish the charge in the relevant infrastructure
Division 3 – Appeals to tribunals relating to                charges schedule or regulated State infrastructure
development applications                                     charges schedule.
Appeals by applicants
4.2.9(1) An applicant for a development application may
appeal to the Building and Development Tribunal against
any of the following-
(a) the refusal, or the refusal in part, of a development
    application;
(b) a matter stated in a development approval, including
    any condition applying to the development, and the
    identification of a code under section 3.1.6;3


2
   Section 6.1.44 (Conditions may be changed or
  cancelled by assessment manager or concurrence
  agency in certain circumstances)
3
  Section 3.1.6 (Preliminary approval may override local
  planning instrument)
                                                                                               Page 7 of 7

Used in these records

About this file

File size
58 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Decision Letter - Change to an Existing Approval - 010.2008.00000746.002 [As Published].pdf · 58 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.