2008/746
3 The stormwater connection shall be undertaken in accordance with an approved arborist’s
report and the following requirements:
3.1 The route for the trench shall be a minimum of 1.5 metres clear of all trees and shrubs
unless otherwise agreed to by Council’s Chief Executive Officer (CEO).
3.2 An arborist shall be on site all times supervising the works being undertaken.
3.3 Prior to excavation existing mulch/leaf cover material over proposed trench shall be raked
back and stockpiled for covering of trench area after completion.
3.4 Works shall be undertaken in a progressive manner and the route reinstated as works
progress.
3.5 Uphill anchor roots of trees shall not be disturbed.
3.6 All works shall be carried out by hand excavation other than the sewer trench under
existing road pavement.
3.7 All excavated material shall be placed on a ‘tarpaulin’ (or similar) alongside the proposed
trench.
3.8 Excavated material shall be used as bedding and backfilling of trench.
3.9 Where works disturb the understorey vegetation, rehabilitation works shall be undertaken
to the reasonable satisfaction of Council’s CEO.
4 Council’s Construction Technical Officer (ph 0410 512 505) shall be given seven (7) days’
notice of intention to commence works to arrange a “pre start” meeting prior to the
commencement of works.
5 The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure that
any sub contractors also have the appropriate insurance and public liability documentation.
6 Prior to the “pre start” meeting, the principal contractor must be provided with a copy of
Council’s signed approved drawings and conditions by the applicant.
7 The Consulting Engineers for the project shall be currently Registered Professional Engineers
of Queensland (RPEQ). The consulting engineers are responsible for arranging all inspections
with Council’s Construction Technical Officer or nominated staff. Council’s Construction
Technical Officer shall provide an inspection form for signing off by the Engineer at appropriate
stages of construction, during on-site meetings. Construction Technical Officer will also sign the
form at each stage when requested conditions have been satisfied. The works will be accepted
“On Maintenance” after this form, signed by the inspector for each stage is complete, together
with a letter from the Engineer requesting that the works go “On Maintenance”.
8 Prior to works commencing, Council is to be advised of the Engineer (RPEQ) supervising the
project. (This person will be the contact for the project).
9 Council standards shall apply to these works unless otherwise modified herein.
10 The person acting on this permit shall ensure that its consultants and contractors take all
reasonable care during the construction of the engineering works to ensure that Council
property, road pavements or facilities (such as underground drainage, water supply, sewerage,
footpaths, kerbing, landscaping, street furniture, etc.) are protected against any damage or
interference whatsoever.
If any Council property or facilities should be damaged by the Applicant or any of its Consultants
or Contractors through any cause whatsoever in the course of, directly or indirectly, carrying out
the engineering works, the Applicant and/or its Contractors shall forthwith notify Council’s CEO
and shall forthwith rectify the damage to that property or facility at its cost and to the satisfaction
of Council’s CEO.
Page 2 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - 010.2008.00000746.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 58 KB (small file)
- File type
No other editions are linked here.