All rectification works are to be completed prior to the commencement of the use or,
alternatively, the Applicant may request Council to carry out the rectification work at the
Applicant’s cost, such cost being paid by the Applicant to Council prior to the commencement of
the use.
In the case of any emergency, Council shall be entitled to rectify such damage at the cost of the
Applicant, such cost being paid prior to the commencement of the use.
11 The development of the site shall be carried out in such a manner as to prevent dust and/or
sand nuisance to residents and/or tenants in the vicinity of the development.
12 Access to the site for all construction and associated works is to be from Allambie Rise. Access
to the development site is not permitted from Park Road.
13 Construction work and other associated activities are permitted only during the hours of 7.00 am
and 6.00 pm Monday to Saturday. No work is permitted on Sundays or public holidays, except
where extended hours are approved by Council’s CEO or his nominee.
14 All signage, including that for safety during construction, shall be in accordance with the Manual
of Uniform Traffic Control Devices and the Transport Infrastructure (Roads) Act.
15 Safe pedestrian access in the vicinity of the project shall be maintained at all times. If footpath /
road closures are necessary to carry out construction works, Council’s Construction Technical
Officer (ph 0410 512 505) must be notified prior to the proposed closure.
16 Sediment and erosion control measures must be in place prior to works commencing. If such
measures are not in place or are not satisfactory, “on the spot “ fines may be issued. Such fines
can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways. Although the sediment and erosion control
measures have been approved on drawing C03/C Council’s CEO, may request further controls
to be installed should approved measures be inefficient.
17 Because of the nature of the terrain, the stormwater drainage line shall be inspected by closed
circuit television (CCTV) at the completion of all works and immediately prior to acceptance ‘On
Maintenance’. Council’s Construction Technical Officer shall be advised of the timing of this
inspection.
A report of the CCTV inspection, including photographic records (which includes photos & video
recordings burnt onto a CD) of the inspection shall be submitted to the Council for approval.
Any defects or substandard works shall be recorded and accurately illustrated on the drainage
plan showing the location of the defect(s).
Substandard work will not be accepted ‘On Maintenance’ and must be rectified at the applicants
expense with a further CCTV inspection arranged once the rectification works have been
completed.
To this extent all CCTV inspections, including any additional inspections necessary following
defect identification and rectification, shall be entirely at the applicant’s expense. Any costs
incurred by Council in reviewing the CCTV inspection results shall also be borne by the
applicant.
18 Prior to acceptance of civil works to become Council assets "On Maintenance", the lodgement
of satisfactory “As Constructed” records shall be submitted to Council.
As Constructed drawings and data shall be certified by a qualified experienced Civil
Engineer(RPEQ) for design intent, and a Licensed Surveyor shall certify the cadastre and the
location, level and type of all services and structures. All of which shall be submitted to Council
for checking and for Council’s records.
The data must fully detail levels for all engineering works including but not limited to drainage
structures, finished ground levels and pavement surface levels. The data shall be submitted in
the Asset Design and As Constructed (ADAC) digital format. Guidelines on the use of ADAC
are available at www.adac.com.au and Council’s “Noosa Planning Scheme Policy 5 –
Engineering Design Standards – Roads, Drainage and Earthworks”.
Page 3 of 7
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Decision Letter - Change to an Existing Approval - 010.2008.00000746.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 58 KB (small file)
- File type
No other editions are linked here.