Original source · versioned page text
Flood Study BSM Job2013 08 Date 15 Sep 2014 Revised
Attached to the e-mail REC14/0009 Information Response.
Original PDF page 42, section 1. The text section number identifies this passage in the reader.
Concentration Times
Subareas 1 - 5
Average Stream Velocity: 5-6% catchment slope = hilly; T = 1206 / 0.9 x 60 = 22 mins
Components Of Flow: 40 m sheet flow @ 10% = 9 mins
530 m steep [email protected] m/sec = 7 mins
730 m [email protected] – 1.1 m/sec = 12 mins
Total: 28 mins
Bransby-Williams: T = 58 L / A0.1 Se0.2 = 58 x 1.206 / 66.8 0.1 x 1.04 0.2 = 46 mins
From 22, 28, 46 mins (average 32) : Adopt Tc = 30 mins
Subarea 7
55 m sheet flow @ 4-5% = 12 mins
230 m swale/channel @ 5% = 4 mins
Total: 16 mins
Subarea 8
130 m sheet flow, partly lawn @ 7% = 16 mins
Subarea 9
85 m sheet flow @ 8% = 13 mins
Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 41
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.