Flood Study BSM Job2013 08 Date 15 Sep 2014 Revised
Attached to the e-mail REC14/0009 Information Response.
Original PDF page 43, section 1. The text section number identifies this passage in the reader.
Subareas 12 – 16
Std inlet time for 10% grade = 9 mins
150 m pipe/kerb along Tewantin Rd@ 6% = 1.2 min
60 m pipe/kerb along Kauri St@ 4% grade = 0.6 mins
115 m pipe/kerb along Pearl St @ 4% grade = 1.2 mins
115 m pipe flow to sapphire [email protected]% grade = 1.8 mins
260 m open easement [email protected]% grade = 6.0 mins
370 m natural floodway @ hydraulic model 0.8 m/sec = 7.7 mins
Total: = 27 mins
Subarea 17
130 m sheet flow @ 4% = 19 mins
Subarea 18
90 m sheet flow @ 4%, partly lawn = 16 mins
Subarea 19
85 m sheet [email protected]%, average grass = 19 mins
85 m natural [email protected] m fall = 5 mins
Total: 24 mins
Q = 0.00278 x F x C x I x A (F = 0.80 / 0.85 / 0.95 / 1.00 / 1.05 / 1.15 / 1.20)
Subs Fi C10 Tc I (mm/hr) A Q (m3/s)
(min) 1 / 2 / 5 / 10 / 20 / 50 / 100 (Ha) 1 / 2 / 5 / 10 / 20 / 50 / 100
1–5 0.21 0.74 28 60 / 67 / 90 / 107 / 123 / 140 / 155 66.8 6.0 / 7.6 / 11.5 / 14.2 / 16.9 / 21.5 / 24.6
7 0.20 0.74 16 80 / 90 / 120 / 140 / 158 / 183 / 202 2.2 0.29 / 0.35 / 0.52 / 0.63 / 0.75/ 0.95/ 1.10
8 0.06 0.71 16 80 / 90 / 120 / 140 / 158 / 183 / 202 2.0 0.25/0.30 / 0.45 / 0.55 / 0.65 / 0.83/ 0.96
9 0.10 0.72 13 89 / 100 / 133 / 155 / 175 / 201 / 221 1.64 0.23/0.27/ 0.40 / 0.49 / 0.59 / 0.74 / 0.85
12-16 0.50 0.80 24 61 / 73 / 98 / 116 / 130 / 153 / 165 44.4 4.8 / 5.8 / 8.6 / 10.8 / 12.8 /16.3 / 18.7
17 0.00 0.70 19 73 / 82 /109 / 129 / 148 / 167 / 186 1.9 0.22/0.26 / 0.38 / 0.48 / 0.57 / 0.71 / 0.83
18 0.04 0.71 16 80 / 90 / 120 / 140 / 158 / 183 / 202 1.7 0.21/0.26 / 0.38 / 0.47 / 0.56 / 0.71 / 0.81
19 0.09 0.72 24 65 / 73 / 98 / 116 / 130 / 152 / 166 1.99 0.21/0.25 / 0.37 / 0.46 / 0.54 / 0.70 / 0.79
Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 42
[OCR of page images]
Subareas 12 — 16
Std inlet time for 10% grade = 9 mins
150 m pipe/kerb along Tewantin Rd@ 6% = 1.2 min
60 m pipe/kerb along Kauri St@ 4% grade = 0.6 mins
115 m pipe/kerb along Pearl St @ 4% grade = 1.2 mins
115 m pipe flow to sapphire [email protected]% grade = 1.8 mins
260 m open easement [email protected]% grade = 6.0 mins
370 m natural floodway @ hydraulic model 0.8 m/sec = 7.7 mins
Total: = 27 mins
Subarea 17
130 m sheet flow @ 4% = 19 mins
Subarea 18
90 m sheet flow @ 4%, partly lawn = 16 mins
Subarea 19
85 m sheet [email protected]%, average grass = 19 mins
85 m natural [email protected] m fall = 5 mins
Total: 24 mins
Q=0.00278 x FxCxIx A
(F = 0.80 / 0.85 / 0.95 / 1.00 / 1.05 / 1.15 / 1.20)
Subs Fi | C10 Tc I (mm/hr) A Q (m3/s)
(min)| 1/2 / 5 / 10 / 20 / 50 / 100 | (Ha)} 1/2 /5 / 10 / 20 / 50 / 100
1-5 | 0.21 | 0.74 | 28 60/67 / 90 / 107 / 123 / 140 / 155 | 66.8 | 6.0/7.6/11.5/14.2/16.9 /21.5 /24.6
7 0.20 | 0.74 | 16 80/90 /120/ 140 / 158 / 183 / 202 | 2.2 | 0.29/0.35/0.52/0.63 / 0.75/ 0.95/ 1.10
8 0.06 | 0.71 16 80/90 /120/ 140 / 158 / 183 / 202 | 2.0 | 0.25/0.30/0.45 /0.55 / 0.65 / 0.83/ 0.96
9 0.10 | 0.72 | 13 89 /100/133/ 155 / 175 / 201 / 221 | 1.64 | 0.23/0.27/ 0.40 / 0.49 / 0.59 / 0.74 / 0.85
12-16 | 0.50 | 0.80 | 24 61/73/ 98 / 116 / 130 / 153 / 165 | 44.4 | 4.8/5.8 /8.6 /10.8 /12.8 /16.3/18.7
17 0.00 | 0.70 | 19 73: 182/109 / 129 / 148 / 167 / 186 | 1.9 | 0.22/0.26/ 0.38 / 0.48 / 0.57 / 0.71 / 0.83
18 0.04 | 0.71 16 80/90/120/ 140 / 158 / 183 / 202 | 1.7 | 0.21/0.26/0.38/0.47/0.56/0.71/0.81
19 0.09 | 0.72 | 24 65/ 73/ 98/ 116/ 130/ 152 / 166 | 1.99 | 0.21/0.25 / 0.37 / 0.46 / 0.54 / 0.70 /0.79
Brisbane Stormwater Management Pty Ltd Document File: WalkevSDF.Doc
Page 42
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.