Original source · versioned page text
Flood Study BSM Job2013 08 Date 15 Sep 2014 Revised
Attached to the e-mail REC14/0009 Information Response.
Original PDF page 45, section 1. The text section number identifies this passage in the reader.
Concentration Times Subarea 7 As per “Pre-Development”, Tc = 16 mins Subarea 8 QUDM std inlet time, 6 – 7% slope = 10 mins Subarea 9 Most of the area is within the 100 yr flood boundary: adopt Tc = 5 mins. Subareas 10 - 18 50 m sheet flow across lawn @ 8% = 13 mins 50 m swale/pipe @ 1% = 1 min Total: = 14 mins Subarea 19 30 m sheet flow across lawn @ 3% = 10 mins 45 m pipe / swale @ 2% = 1 min Total: = 11 mins Subarea 20 Most of the area is within the 100 yr flood boundary: adopt Tc = 5 mins Subarea 29 - 35 70 m sheet flow across lawn @3% = 17 mins 65 m pipe/kerb @ 2 m fall = 1 min 160 m pipe @ 6 m fall = 2 mins Total: = 20 mins Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc Page 44
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.