Skip to the record
Noosa's #1 Council Tracker.

Original source · versioned page text

Flood Study BSM Job2013 08 Date 15 Sep 2014 Revised

Attached to the e-mail REC14/0009 Information Response.

of 64

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

Original PDF page 46, section 1. The text section number identifies this passage in the reader.

Subarea 36

QUDM std inlet time for 8% grade = 10 mins
70 m wq-swale & pipes @ 1%       = 2 mins
Total :                            = 12 mins



Subarea 37

As per “Pre-Development” : 16 mins



Subarea 38

QUDM std inlet time for 1.5% grade = 15 mins
5 – 10 m pipe                       = 0 mins
Total:                               = 15 mins




Q = 0.00278 x F x C x I x A          (F = 0.80 / 0.85 / 0.95 / 1.00 / 1.05 / 1.15 / 1.20)

 Subs     Fi    C10     Tc                   I (mm/hr)                    A                      Q (m3/s)
                       (min)      1 / 2 / 5 / 10 / 20 / 50 / 100         (Ha)      1 / 2 / 5 / 10 / 20 / 50 / 100
   7     0.30   0.76    16       80 / 90 / 120 / 140 / 158 / 183 / 202   2.25   0.30/ 0.36/ 0.54 / 0.67 / 0.79 / 1.00 / 1.15
   8     0.60   0.82    10     97 / 109 / 147 / 171 / 194 / 224 / 245    0.29   0.05/ 0.06/ 0.09 / 0.11 / 0.13 / 0.17 / 0.19
   9     0.00   0.70     5      121/137 /185 / 216 / 247 / 288 / 318     0.72   0.14/ 0.16/ 0.25 / 0.30 / 0.36 / 0.46 / 0.53
 10-18   0.50   0.80    14      84 / 96 / 128 / - / - / - / -            1.35     0.20/ 0.24/ 0.37/ ---- / ---- / ---- / ----
  19     0.60   0.82    11       94/106 /143 / 166 / 189 / 218 / 238     0.37   0.06/0.08 / 0.11 / 0.14 / 0.17 / 0.21 / 0.24
  20     0.00   0.70     5     121/137 / 185 / 216 / 247 / 288 / 318     0.99   0.20/0.22 / 0.34 / 0.42 / 0.50 / 0.64 / 0.74
 29-35   0.46   0.79    20       71 / 80 / 106 / --- / --- / --- / ---   3.09    0.39 / 0.46 / 0.68 / --- / --- / --- / ---
  36     0.45   0.79    12     92 /103 /138 / 160 / 183 / 211 / 231      1.32   0.21/0.25 / 0.38 / 0.48 / 0.56 / 0.70 / 0.80
  37     0.08   0.72    16       80 / 90 / 120 / 140 / 158 / 183 / 202   0.84   0.11/0.13 / 0.19 / 0.24 / 0.28 / 0.35 / 0.41
  38     0.60   0.82    15       82 / 92 / 124 / 144 / 164 / 188 / 206   0.40   0.06/0.07 / 0.11 / 0.13 / 0.16 / 0.20 / 0.23




   Brisbane Stormwater Management Pty Ltd Document File: ValkevSDF.Doc                                             Page 45


[OCR of page images]
Subarea 36

QUDM std inlet time for 8% grade = 10 mins

70 m wq-swale & pipes @ 1% = 2 mins
Total : = 12 mins
Subarea 37

As per “Pre-Development” : 16 mins

 

Subarea 38
QUDM std inlet time for 1.5% grade = 15 mins
5-10 m pipe = 0 mins
Total: = 15 mins
Q=0.00278 x FxCxIx A (F = 0.80 / 0.85 / 0.95 / 1.00 / 1.05 / 1.15 / 1.20)
Subs Fi C10 Tc I (mm/hr) A Q (m3/s)

(min) 1/2/ 5 / 10 / 20 /50 / 100 | (Ha) 1/ 2/5/10 / 20/50 / 100
0.30 | 0.76 16 80/90/ 120/140 / 158/ 183/202 | 2.25 | 0.30/ 0.36/ 0.54 / 0.67 / 0.79 / 1.00/ 1.15
0.60 | 0.82 10 97/109 / 147/171 / 194/224/245 | 0.29 | 0.05/0.06/ 0.09 / 0.11 / 0.13 / 0.17 /0.19
9 0.00 | 0.70 5 121/137 /185 / 216 / 247 / 288 / 318 | 0.72 | 0.14/0.16/ 0.25 / 0.30 / 0.36 / 0.46 / 0.53
10-18 | 0.50 | 0.80 14 84/96 / 128 / - / - / -/ - | 1.35 | 0.20/0.24/0.37/ ----/ --- -- | ----
19 0.60 | 0.82 11 94/106 /143 / 166 / 189 / 218/238 | 0.37 | 0.06/0.08 / 0.11 /0.14/0.17/0.21 /0.24
20 0.00 | 0.70 5 121/137 / 185 / 216 / 247 / 288/318 | 0.99 | 0.20/0.22 / 0.34 / 0.42 / 0.50 / 0.64 /0.74
29-35 | 0.46 0.79 20 71/80/106/ --- / --- / --- /--- | 3.09 | 0.39/0.46/0.68/ --- / --- / --- /---
36 0.45 0.79 12 92 /103 /138/ 160 / 183/211 /231 | 1.32 | 0.21/0.25/0.38/0.48 / 0.56 /0.70/0.80
37 0.08 0.72 16 80/90/ 120/140 / 158/ 183/202 | 0.84 | 0.11/0.13 /0.19 /0.24/ 0.28 / 0.35 /0.41
38 0.60 | 0.82 15 82/92 /124/ 144/ 164/ 188/206 | 0.40 | 0.06/0.07 / 0.11 / 0.13 / 0.16 / 0.20 / 0.23

 

 

oo;

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Brisbane Stormwater Management Pty Ltd Document File: WalkevSDF.Doc Page 45
Log in to download the original file

Flood Study BSM Job2013 08 Date 15 Sep 2014 Revised.pdf · 3.9 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.