Council archive · source document
2009 KHA Original Report · REC14/0015
Attached to the e-mail REC14/0015 Report, Previous IR response, Plans and owner's consent Email 2 of 3.
KHA Development Managers May 2009 designed and sited to— a) provide flood free access to premises and flood free habitable areas; b) allow only minor, short term and infrequent flooding of non- habitable areas; c) ensure drainage does not adversely impact upon other premises; and d) ensure filling or excavation does not adversely impact upon other premises by— i. causing ponding on the site or nearby land; ji, increasing flooding, which adversely affects the safety or use of any Jand upstream and downstream; and adversely affecting the flow of water in any overland flow path. rooms are not less than the specified minimum floor levels AND $18.2 Where infrastructure is available— a) any drainage (including buildings Council and yards) flows to that infrastructure; and b) the infrastructure has the capacity to accept any additional loading; AND $18.3 For Detached houses and Multiple housing— a) where slab on ground construction is used, filling does not extend more than 1m beyond the building footgrint, measured from the outer wails of the building ; or b) the design consists of suspended floor construction. a Ree O15 For the Business Centre Zone, outside of the Mary Street/Thomas Street Precinct the maximum plot ratio is — 0.8:1 for site areas up to and including 2,000m2; plus 0.3:1 for the balance portion of the site area in excess of 2000m2. N/A 016 For the Business Centre Zone within the Mary Street/Thomas Street Precinct the maximum plot ratio is 0.5:1. N/A 017 Within the Shire Business Centre Zone, the maximum plot ratio for development within the following precincts is — a) Precincts Bi and B2 combined- 0.5:1; b) Precinct B3- 0.8; c) Precinct E1- 0.6; d) Precinct E2- 0.6; e) Precinct E3- 0.6; f) Precinct E4- 0.6; g) Precinct E5- 0.6 h) Precinct E6- 0.6; i} Precinct £7- 0.6; j) Precinct RES- 0.6; and k) Precinct REC/MU- 0.1. Flooding and drainage 048° Buildings and other works are | $18-1- -Floor—levels- for habitable-|-Can-Comply—-—- - Future residential dwellings can comply with prescribed floor levels, construction and drainage specifications.. This will be addressed in a future application. Sloping sites & ridgelines O19 = Development on stoping sites— $19.1 Buildings and associated access ways are not constructed on Complies The subject site has slope of less Town Planning Report Reconfiguration of a Lot Eumundi Noosa Read, Noosaville Page 12 of 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2009 KHA Original Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.