Council archive · source document
2009 KHA Original Report · REC14/0015
Attached to the e-mail REC14/0015 Report, Previous IR response, Plans and owner's consent Email 2 of 3.
KHA Development Managers May 2009 Specific Outcomes the subdivision design provides for the maximum practicable number of lots with house site areas that— a) maximise solar access to the north in winter; b) minimise solar access to the east and west in the summer; c) maximise access to any prevailing summer breezes; and d) minimise exposure to prevailing winter winds. Peete Rae Design provides for all lots with tong axis facing north and short axis facing east/west allowing preferred solar access to be achieved with building design. This orientation also allows maximum access to prevailing summer breezes. 14.189 Infrastructure 015 Each lot is capable of being serviced by appropriate levels of— a) water supply; b) reticulated sewerage; c) stormwater drainage; d) power supply; and e) telecommunications; AND O46 The design and provision of public services and utilities, including sewerage, water, electricity, street lighting and telecommunication services— a) meets the needs of users; b) ensures health, safety and convenience of the community; _| ©) protects the natural environmental values of the site and surrounds, including visual amenity and native vegetation; d) are cost effective over their life cycle; @) minimises adverse impacts to the environment (including the amenity of the local area) in the short and long term; and f) ensures that the existing systems are upgraded or relocated to be capable of supporting the proposed development; AND $15.1 All lots are connected to power supply and telecommunications services; AND $16.1 For lots in urban settlements—power supply and communications infrastructure are provided underground; or $16.2 For lots elsewhere — power supply and communications infrastructure are provided underground unless. @) located in the Rural Zone or Rural Settlement Zone and where not in a Bushfire Hazard Area as defined on Overlay Maps OM1.4- OM9.4; b) new low voltage lines can be strung from poles carrying existing high voltage lines; or ¢) no extensions to the existing reticulation network is necessary; or d) it is necessary to cross a body of water; AND $16.3 Street lighting is provided in accordance with Section 3.19 of PSPS Engineering Design Standards — Roads, Drainage and Earthworks; AND $16.4 For lots not within a sewerage service area—the lot has sufficient area and other attributes to ensure sustainable on-site sewerage disposal; Advisory note ___ | Can Comply All lots can be connected to power and telecommunications services Can Comply All services can be provided underground. N/A N/A N/A Town Planning Report Reconfiguration of a Lot Eumundi Noosa Road, Noosaville Page 21 of 31
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2009 KHA Original Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.7 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.