Skip to the record
Beware of cheap imitations.

Council archive · source document

2009 KHA Original Report · REC14/0015

Attached to the e-mail REC14/0015 Report, Previous IR response, Plans and owner's consent Email 2 of 3.

of 32

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

KHA Development Managers

May 2009

 

Specific Outcomes

W Probable Solutions

eam)

 

O17 Essential public utilities are
available and maintain their function
during flood events up to a

1% AEP (1:100 year ARI) flood
event.

PSP24 — Effluent Disposal details
requirements for the design and siting of
effluent disposal systems where focated
outside a sewerage service area.
Compliance with PSP2¢ will be
considered as part of Council's
assessment of the plumbing and
drainage application.

 

$17.1 Components of the
infrastructure that are likely to fail
or may result in contamination are—
a) located above the level of a 1%
AEP (1:100 year ARI) flood event;
or

b) designed and constructed to
exclude water inundation or
infiltration and resist hydrostatic
and hydrodynamic forces as a result
of inundation.

Can Comply

All services can be located above
1:100 year ART

 

Electricity supply infrastructure
018 Uses and works maintain a
safe distance from electrical
infrastructure including substations,
overhead power lines, power poles
and transformers.

$18.1 Building footprints are
situated clear of any power
easements on-site;

AND

§18.2 Building footprints are not
less than 50m from an existing
fenced electricity substation.

Complies
No power easements located on-site

Complies
No electricity substation within 50m

 

44.190 Earthworks and stormwa

ter management.

 

019 Stormwater run-off is
managed so as not to cause any
adverse impacts on the built or

| natural environment including. _ -
changes in quality, quantity

or location of stormwater
discharges.

No solution provided

Can Comply
Stormwater will be undertaken in
accordance with an approved

 

020 Filling or excavation only
occurs where it does not adversely
impact on—

a) watercourses, drainage lines and
wetlands; or

b) vegetation on land identified on
Biodiversity Overlay Maps OM1.1-
OM9.1; or

c) water levels on properties
elsewhere.

No prescribed solution.

N/A
No filling or excavation is proposed
as part of this application.

 

14.191 Landscaping and_visual amenity.

 

021 Land development responds to
the distinctive landscape character
of the site by utilising the natural
features of the site, which include—
a) watercourses and drainage lines;
b) significant trees;

c) understorey vegetation;

d) rock outcrops; and

e) views.

$21.1 The natural landform and
landscape are not modified to
accommadate the development.

Complies

No substantial modification of
landform proposed as part of this
application.

 

 

022 Native vegetation, including

 

$22.1 Buffers of existing native

 

N/A

 

 

Town Planning Report
Reconfiguration of a Lot
Eumundi Noosa Road, Noosaville

Page 22 of 31

Stormwater Management Plan. | |

 

Used in these records

About this file

File size
2.7 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

2009 KHA Original Report.pdf · 2.7 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.