Delegated Report - Code - Planning OPW26 0069 (As Published)
2. APPLICATION BACKGROUND
The information provided as part of the application was sufficient for Council to assess. A Request
for Information was not issued.
3. SITE DETAILS
3.1. Site History
The application is required to comply with the higher order approval MCU25/0118.
The application is over land that has not yet been titled but has been approved by Council
(RAL25/0005). The works required to facilitate the titling of this lot are ongoing.
3.2. Site Description
The subject site is under going construction as part of RAL25/0005.
3.3. Surrounding Land Uses
The subject site adjoins a future drainage lot (Bioretention Basin), vacant land and a cemetery.
4. ASSESSMENT
4.1. Instruments for Statutory Assessment
Under the Planning Act 2016 the application must be assessed against each of the following
statutory planning instruments to the extent they are relevant to the development:
• State Planning Policy;
• South East Queensland Regional Plan;
• Planning Regulation 2017; and
• Noosa Plan 2020 (20 March 2026).
4.2. Noosa Plan 2020
The following codes from the Noosa Plan 2020 are applicable to this development:
• Works Codes
The application has been found to generally comply with all applicable statutory instruments. The
pertinent issues arising out of the assessment are discussed below:
Access
The proposal seeks to take access from a new, Council-owned Road which is currently under
construction. The access has been designed to generally comply with Council’s standard drawing
RS-051.
Stormwater
The proposal seeks to capture all runoff via a new underground pipe drainage network before being
discharged to two future stormwater pits (to be provided as part of the creation of the Lot) to serve
as the Lawful Points of Discharge.
All impervious areas of the development are to be provided with an on-site detention tank that has
been sized to ensure that post-development flows will not exceed pre-development flows for all
events up to, and including, the 1% AEP storm event. A climate change allowance was always
included pursuant to Council’s Planning Scheme Policy 6 Engineering Design Standards.
Stormwater quality treatment is not provided as part of these works, as the development site
discharges into a Council-owned bioretention basin that has been sized to accept flows from the
developed subject site.
Erosion and Sediment Control
Engineering recommends a full suite of erosion and sediment control conditions, including, but not
limited to:
Page 3 of 17
Document Set ID: 25035493
Version: 2, Version Date: 07/08/2026
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original (Delegated Report - Code - Planning OPW26 0069 (As Published).pdf)
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.