Council archive · source document
Judgement.pdf [As Published] · 132007.1259
61. 62. 63, 64. 65. 66. 67. 68. 69. rainwater tanks must be amended to include rainwater tanks/alternative water supply for the commercial/hostel building fronting David Low Way. All stormwater drainage (including roof water overflow from the rainwater storage system) shall be collected and discharged so there is no net increase in stormwater runoff from the site. Stormwater drainage permitted to drain from the site shall be discharged via existing and proposed drainage structures contained within the site, as detailed within the Simmonds Bristow report titled "Essence of Peregian Stormwater Management Plan, Sediment and Erosion Control! Plan", dated 30 November 2009, except as modified by these conditions. The maximum discharge of stormwater drainage allowable to Council's kerb & channel street drainage system at any one location is 25 litres/second. A detailed Stormwater Management Plan and a Sediment and Erosion Control Plan shall be prepared. This will generally be in accordance with Simmonds and Bristow Report “Essence of Peregian Stormwater Management Plan, Sediment and Erosion Control Plan’, dated 30 November 2009. MUSIC modelling and reporting shall be refined to incorporate the final proposed design. Grease and Oil arrestors and/ or stormwater quality improvement devices must be incorporated into the design to treat all run-off prior to run-off exiting the premises Grease and Oil arrestors or stormwater quality improvement devices must be consistent with the design and water quality objective requirements specified within the Essence of Peregian Stormwater Management Plan, Sediment and Erosion Control Plan dated 30 November 2009. A detailed maintenance plan shall be prepared for the proposed stormwater management system, which shall be submitted to the Council for approval prior to obtaining a Development Permit for Operational Works. The approved maintenance plan shall be incorporated in the Community Management Scheme for the development and a copy of this shall be provided for Council's records prior to commencement of the approved Use. A Development Permit for Building Works shall not be granted until a Development Permit for Operational Works has been issued in regard to the drainage scheme. The fill material (including topsoil) to be used within stormwater treatment areas (i.e. including but not limited to stormwater infiltration swales and other areas as required by the Simmonds and Bristow Plans) shall achieve a minimum infiltration rate of 75mm/hour without clogging. Sand is required to achieve this infiltration rate hence clays and silts are not allowed as fill material. Specific infiltration and soils property testing shall be carried out to demonstrate the suitability of proposed fill material. Such testing shall be on the fill material prior to placement. All habitable dwellings shall be located above the ARI 100 year flood level, which is set at RL 3.5m for the site. The ARI 2 year event flood level is set at RL 3.0m AHD in relation to regional flooding. All site stormwater drainage shall be by means of a gravity system. In this respect, the application for Operational Works Approval for Stormwater must be accompanied by a stormwater drainage plan that demonstrates compliance with this condition. Environmental Management Plan 70. 71. An Environmental Management Plan (EMP) for the Site shall be prepared and implemented by persons holding appropriate environmental qualifications and proven expertise in the preparation and implementation of EMPs, to ensure that the impact on the environment of the construction and operation of the Development is minimised, the Environmental Values of the Site are protected and enhanced and the Development is ecologically sustainable. The EMP shall be cognisant of the following:-
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Judgement.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.