Council archive · source document
Judgement.pdf [As Published] · 132007.1259
56. 57. 58. 59. 55.1 document the current status of the areas requiring ecological restoration in terms of structure, floristics, missing elements, health, vigour, etc.; 55.2 specify the required works and actions for each area in terms of: 55.3. site preparation (this may include thinning, grass removal, weed removal and control, etc.); 55.4 establishment of the missing floristic and structural elements; 55.5 creating opportunities for regeneration from the seed bed, natural recruitment and the establishment of wildlings; 55.6 habitat creation and reinforcement for native fauna and reinforcement of habitat linkages and corridors; 55.7 planting and mulching procedures; 55.8 fertilizing procedures; 55.9 watering procedures; 55.10 protection from wildfire, particularly during the establishment phase; 55.11 erosion and sediment control; 55.12 on-going maintenance; 55.13 access for maintenance; 55.14 environmental safeguards; and 55.15 incorporation of the relevant requirements of all the management plans required by this approval, particularly the Bushfire Management Plan and Koala Management Plan. The eradication and control of environmental weeds will be an integral part of both the Ecological Restoration Plan and the Landscaping Works. Vegetation used in restoration work and landscaping shall exclude environmental weed species. A wire fauna fence shall be erected around the perimeter of the park areas to be protected and restored, prior to construction activities commencing on site. The fauna fence will have signs attached restricting entry to authorised persons only. The contract for the Ecological Restoration work shall specify a 1 year maintenance period from the date restoration works are completed by the contractor to the reasonable satisfaction of the Council's Coordinator of Environment and Landscaping, by which time the ecologically restored areas should be self-sustaining. It shall also be weed-free to the satisfaction of the Manager, Council’s Coordinator of Environment and Landscaping. The applicant must provide Council's Coordinator of Environment and Landscaping with a certification from a suitably qualified person confirming that management of weeds within the park area complies with the requirements of the Land Protection and Stock Route Management Act. All the relevant ecological restoration works and actions shall be undertaken by the Developer and completed prior to dedication of the park areas to Council. Roof Water & Stormwater Drainage 60. Roof runoff from any new building shall be directed to a rainwater storage system or tank that is installed to ensure water from the rainwater storage system or tank is used for external uses (such as watering gardens, irrigation, ornamental ponds, water features, topping-up swimming pools, outdoor cleaning, etc) and for internal (ground floor) use in washing machine cold taps and toilet cisterns. All rainwater fanks are to be designed and installed in accordance with the Queensland Development Code (QDC) current at the time of building approval, and shall be part of the plumbing application for approval. The location and capacity of the tanks shall be clearly shown on the plans submitted for Operational Works approval and any overflow shall be directed to the on site stormwater drainage system. In particular, the plans detailing
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Judgement.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.