PSP12 — Public Open Space Contributions (Park) $47, 529.00
PSP16 — Sewerage Headworks Contributions $387,739.08
PSP17 — Water Supply Headworks Contributions $346,368.38
| PSP20 ~ Pathway Trunk Network Contributions $32,272.83
TOTAL Contribution Amount = $813909.29

 

 

Please note, that these amounts are all subject to variations in the Consumer Price Index, All
Groups Brisbane from September 2009 until the date of payment.

 

 

 

All contributions must be paid prior to commencement of the use.
General

89. For the following classes of work associated with development, a Development Permit
for Operational Works must be obtained prior to commencement of works relating to
that class of work. The application may combine any or all of these classes of work:-

89.1 Access and/or Carparking.
89.2 Site Civil Works.

89.3 Stormwater Drainage.
89.4 Frontage Works.

89.5 Sewer reticulation (including new mains, relocations, diversions, pump
stations and rising mains).

89.7 Water reticulation.
89.8 Landscaping.
89.9 Erosion & Sediment Control

90. A suitably qualified Registered Professional Engineer shall prepare engineering
drawings and specifications for all engineering works that will become Council
infrastructure, which shall be submitted in conjunction with an application for a
Development Permit for Operational Works. In this regard a DXF/DWG file on GDA94
zone 56 grid of the proposed cadastre layout is to be submitted in conjunction with any
application for Operational Works.

91. Digital detailed designs including drawings, calculations, specifications and a schedule
of works, shall be submitted with any application for a Development Permit for
Operational Works in respect of roadworks and stormwater drainage works. The design
shall be in accordance with Council’s Planning Scheme Policy PSP05 — Engineering
Design Standards — Roads, Drainage and Earthworks. To avoid conflict with
underground pipes or services, all existing and proposed services required by the
development shall be shown on the plans.

92. To facilitate production of As Constructed drawings it is suggested that all design
drawings are submitted in the Asset Design and As Constructed (ADAC) digital format.
(Guidelines on the use of ADAC are available at www.adac.com.au).

93. A construction management plan/strategy to ensure no damage occurs to Council
services shall be prepared by a suitably qualified Registered Professional Engineer and
submitted to Council in conjunction with any application for Operational Works.

94. Any damage caused to any public utility during the course of construction shall be
repaired to Council's standards and at no cost to Council.

95. Any alteration of any public utility or other facilities necessitated by the development of
the land or associated construction works external to the site shall be at no cost to
Council.

Used in these records

About this file

File size
6.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Judgement.pdf [As Published].pdf · 6.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.