Council archive · source document
Judgement.pdf [As Published] · 132007.1259
8. All fencing shall be setback at least 1 metre from the front property boundary, with at least half of the fencing setback 2 metres. The area of land between the fence and the front property boundary shall be densely landscaped to screen any fencing from the street. Any advertising sign or device is to comply with Council’s policies on advertising. Building Height 9. 10. The finished height of the buildings shall not exceed the heights identified on the approved plans of development. A verification survey of the building is to be carried out by a Licensed Surveyor and a certificate lodged with Council at completion of work confirming compliance with the maximum allowable building height as required by the conditions of approval. Business Uses 11. 12. 13. 14. 15. The ground floor retail tenancies are to have a minimum of 50% transparent glazing fronting the street. All goods are to be displayed on site within the property boundaries and/or on the premises approved for the use. No outdoor dining is permitted for the shops and restaurants. The office is approved for the administration of the Visitor Accommodation units and the development in general only. The shops and restaurant shall not operate outside the hours of Sunday to Thursday 7am to 10pm, and Friday and Saturday 7am to 12 midnight. Existing Vegetation 16. 17. 18. 19. 20. Existing trees on the site and within road reserves are to be retained, except where tequired to be removed due to building operations. In this regard, all native trees located outside the general building footprints, driveways, and car parking areas shall be retained on site. All trees to be retained and/removed shall be identified in the landscape plans. All significant trees in the frontages of the site (excluding palms) shall be retained as far as practical. Following investigation into the root structure of those trees, reallocation of carparking and motorcycle spaces is to be made to provide clearance to roots. An arborist shall be engaged to confirm appropriate conditions and working clearances. The trees required to be retained shall be protected from construction impacts in accordance with an approved arborist report submitted with an application for a Development Permit for Operational Works. A qualified arborist shall monitor the health and structural integrity of the trees to be retained on site. The monitoring shall occur at least monthly during the construction period and quarterly for 12 months after construction is completed. The developer shall rectify any decline in the health or structural integrity of the trees, in accordance with the arborist’s recommendations. Cleared vegetation is to be suitably processed by one of the following methods and removed from the site:- 20.1 Re-use for building materials. 20.2 Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled loose in heaps of less than 1000 cubic metres, less than 2.5 metres high with a minimum of 10 metres between edges of heaps. 20.3 Disposal for firewood. 20.4 Disposal for landscaping purposes.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Judgement.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.