Council archive · source document
Judgement.pdf [As Published] · 132007.1259
20.5 Transport to alternative site for breaking down materials provided that all necessary permits have been obtained to allow the alternate site to be used for this purpose. 20.6 The disposal method for clearing works is to be submitted in conjunction with an application for a Development Permit for Operational Work. The Applicant is advised that other methods may be considered provided full details of the method are submitted. The Applicant is advised that burning off is an unacceptable method of disposal. Landscaping 21, The open space and setback areas are to be landscaped in accordance with Council's Policy on Landscaping Guidelines and a properly prepared landscape plan. Such landscaping is to be completed prior to the premises being occupied and shall be maintained at all times thereafter. The landscaping plans submitted for approval shall include:- 21.1 Native trees of a minimum bag size of 100L to replace existing trees to be removed from the site, at the rate of 1 replacement tree for every 1 tree removed. 21.2 A vegetated buffer to screen the commercial building to the Road 151 (stub road) adjacent the site’s southern boundary. 21.3 A vegetated buffer a minimum of 3 metres wide along the site’s eastern boundary to Peregian Beach Hote! to screen and provide filtered views of the development from David Low Way. 21.4. A minimum of 16 trees of a minimum bag size of 100L and 4 trees of a minimum bag size of 400L shall be provided to the site's road frontages. 21.5 A feature tree of a minimum bag size of 400L provided to the David Low Way frontage planted between Buildings A & B to replace the proposed sculpture. 21.6 The 3 metre wide landscape areas to David Low Way frontage shall be extended to reduce’ the extent of hard pavement and increase the amount of soft landscaping. 21.7 Landscape treatment (including paving) to the site's road frontages shall be designed to match in with the existing streetscape of Peregian Beach Village. 21:8 Planting and maintenance regime details to address the ongoing health of all large plantings (i.e. greater than 45L); Fire Management 22. The development shall be carried out generally in accordance with the fire management measures recommended in the Natural Solutions Report dated 21 November 2007. Bicycle Parking & End of Trip Facilities 23. 24. Secure bicycle racks shall be provided on site to accommodate a minimum of 17 bicycles. The cycle parking rack is to be made available for customers and staff of the retail premises at all times during business hours. End of trip facilities shall be provided for staff and shail include: 24.4 a minimum of six lockers; and 24.2 a minimum of one male and one female shower cubicles with ancillary change rooms. Outdoor Lighting 25. Any outdoor lighting with the potential to affect surrounding residential premises shall be designed, installed, operated and maintained in accordance with AS4282 “The Control of the Obtrusive effects of Outdoor Lighting’.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Judgement.pdf [As Published]Related documentApplication case desk ↗
About this file
- File size
- 6.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.