response to information request 3 Allambi
5. Provide an amended Stormwater Management Plan that is consistent with the
recommendations of the site specific geotechnical assessment.
6. Provide additional information to demonstrate how a low risk slope stability is
achieved for the subject development and no adverse impacts are created on
the neighbouring land (north, south and west).
Robert Gibb (RPEQ) from Tectonic provides the following commentary:
‘In Section 6.5 of our report, we intimated that the use of an engineer designed
soakage/infiltration system would be acceptable from a stability perspective. This
is what has been proposed by Westera.’
‘As part of our stability assessment for the site, we have provided a qualitative
assessment in accordance with AGS 2007, which indicates a ‘Low Risk’ of
instability could be achieved, subject to the implementation of the
recommendations of our report. It should be noted that as part of the method used
within AGS 2007 consideration for effects on adjacent properties is required.
Stability for the proposed development was demonstrated further with numerical
analysis, an extract of which was included in our report showing a factor of safety
of 1.5 for long term conditions. To maintain this, a non-worsening condition should
be achieved in terms of surface run-off and stormwater infiltration comparing
existing conditions against those proposed at the site. Section 6 of the Westera
Stormwater Management report indicates that the neighbouring properties or
receiving environment would not be adversely affected, where the soakage trench
is constructed in accordance with their design.’
Figure.6 Stormwater Management Plan Details
Page 6 of 9
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.