Council archive · source document
response to information request 128-133 gympie tce francis · MCU22/0196
8. If the basement slab does not entirely seal the basement, provide additional detail
demonstrating how any groundwater seepage into the basement will be controlled,
collected and released without the use of a stormwater pump. The detail must be
prepared by a suitably qualified person (RPEQ – Registered Professional Engineer
of Queensland).
9. Provide an Acid Sulfate Soils Management Plan, which includes a Dewatering Plan,
demonstrating how Acid Sulfate affected soils and water encountered during
excavation will be treated and disposed of or reused. The additional plans must be
prepared by a suitably qualified person (RPEQ – Registered Professional Engineer
of Queensland) and adhere to the recommendations made in Appendix E of Pacific
Geotech Consulting’s ACID SULFATE SOIL REPORT (PG-9236) dated November
2022.
10. Provide an amended Earthworks Plan that incorporates the recommendations made
in Appendix E of Pacific Geotech Consulting’s ACID SULFATE SOIL REPORT (PG-
9236) dated November 2022. The amended plan must be prepared by a suitably
qualified person (RPEQ – Registered Professional Engineer of Queensland) and
include, but not be limited to:
a. a temporary stockpile and treatment area for Acid Sulfate Soils;
b. a suitably sized drain or retention basin to collect drainage from the
treatment area; and
c. a temporary stockpile for treated soils for the purpose of general reuse or
removal.
11. Provide additional detailing on the proposed concrete piling within the development.
The detailing must be prepared by a suitably qualified person and include, but not
be limited to:
a. standard details of the concrete piling;
b. anchoring points (noting that all anchoring points, both above and below
ground, both temporary and permanent, must be contained entirely within
the subject site unless written permission from the respective landowner(s)
is provided to Council); and
c. demonstrate the structural integrity of the surrounding lots (Lot 128 & 134
Gympie Terrace and Chaplain Park, Mill Street) will not be undermined as
result of the excavation.
12. Provide additional detail demonstrating how the proposed pool excavation will
occur, noting that owners’ consent will be required if the contractor wishes to utilise
the western property (128 Gympie Terrace) or northern park (Chaplain Park, Mill
Street) in any capacity.
13. Provide additional information demonstrating the effects the water table and existing
natural constraints will have on the basements’ waterproofing ability to avoid
seepage. The additional information must be certified by a suitably qualified person
(RPEQ – Registered Professional Engineer of Queensland).
14. Provide sufficient detail to demonstrate that the development achieves compliance
with The Noosa Plan 2020 – Sustainable Building Design Code. The detail must be
prepared by a suitably qualified person (RPEQ – Registered Professional Engineer
of Queensland). Any proposed reuse & attenuation tanks must be certified by a
geotechnical engineer where located below the water table to ensure they are
adequately secured and unable to move due to the natural water table.
15. Provide additional detail on the proposed development’s internal drainage system.
The detail must be prepared by a suitably qualified person (RPEQ – Registered
Professional Engineer of Queensland) and include, but not be limited to:
a. the surface levels, invert levels, lengths and grades of all internal stormwater
infrastructure; and
b. a longitudinal section of each stormwater ‘line’;
c. indicate where the roof downpipes connect to the proposed stormwater
system; and
d. amendments demonstrating compliance with the Sustainable Building
Design Code (Item 8.);
16. Provide additional detail demonstrating where the ‘150 grated drain’ will discharge
to.
17. Provide additional detail and comment demonstrating how the proposed stormwater
system and associated infrastructure will function during, up to and including, 1%
AEP events (including flood events) and when experiencing an average annual
rainfall increase of 20% by the year 2100. The additional detail and comment must
be prepared by a suitably qualified person (RPEQ – Registered Professional
Page 5 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
response to information request 128-133 gympie tce francis.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.