1209 SWQMP Report_3 2013
Callaghan & Toth
Farm contour benches which form the existing catchment that drains all runoff to existing
dams at the base of each valley. The dams 1 & 2 shown on plan Plan 01 will have a 5m wide
broad crest weir spillway which will alternate flows to be equal to pre-development
concentrations.
The dam modifications have been modelled to act as a detention basin. The spillway size is
sufficient to reduce the increase in runoff from the roofs (Table 5.1) for a Q5, Q10 and Q100
storm back to predevelopment levels as shown in Table 5.2. Refer to attached Detail
detention basin calculations for Q10 Pre and Post development flow calculation for Dams
and Roofs in Appendix 5
TABLE 5.1: Pre-Development and Post Development Discharges
Location Q5 Q10 Q100
Pre-Development Roof Area 0.538 m3/s 0.638 m3/s 1.092 m3/s
3
Post Development Roof Area 0.769 m /s 0.851 m3/s 1.227 m3/s
3
Roof Flow Increase 0.231 m /s 0.221 m3/s 0.135 m3/s
TABLE 5.2: Pre Dam Spillway and Post Dam Spillway
Location Q5 Q10 Q100
3
Pre-Dam 1&2 Spillway 2.200 m /s 2.58 m3/s 4.50 m3/s
Post Dam 1&2 Spillway Spillway depth Spillway depth Spillway depth
0.24m 0.26m 0.42m
1.81 m3/s 1.90 m3/s 3.49 m3/s
Dam 1&2 Spillway flow -0.39 m3/s -0.68 m3/s -1.01 m3/s
Decrease
The detention effects of Dam 1 & 2 spillways in all cases reduce the flows by more then the
increase in flow caused by the shed roofs.
As there are existing gravel roads already along the ridges the effect on runoff from the new
gravel roads is considered to be similar to the runoff from the existing roads.
25
1209 Animal Husbandry – Top Forestry Rd, Ridgewood SWQMP_REV_3
September 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.