Original source · versioned page text
1209 SWQMP Report_3 2013
Callaghan & Toth
Construction Phase
Objective The Contractor will install the Bioretention System in accordance with the
Operational Works drawings.
Actions Bioretention systems to be constructed at the end of civil works for the
development.
Bioretention systems used for sediment basins during civil works construction
shall have sediments removed prior to layout of bioretention zone.
Construct Bioretention systems in accordance with steps as detailed in “Water by
Design – Construction and Establishment Guidelines: Swales, Bioretention
Systems and Wetlands” Version 1 dated February 2009.
Contractor to conduct regular watering of all planted bioretention systems until
such time as plants are established.
Contractor to ensure bioretention systems are protected from sediment laden
stormwater runoff during construction period or only install once upstream
catchment is stabilised.
Monitoring The Contractor will carry out weekly inspections of the Bioretention system
(Including three monthly during the defects liability period). The following will be
examined at each inspection:
¾ Sediment build up on the surface
¾ Health of vegetation
¾ Pondage during major storms not infiltrating into the sand
¾ Erosion at the outlet
¾ Pondage during minor storms
Reporting Contractor to maintain a log of inspections, watering and other actions.
Records are to be logged and kept for verification of compliance on a need basis.
Bio-retention designer / Engineer shall perform inspections during construction
stage and fill out Water by Design forms for compliance.
Incidents ¾ Bioretention systems not installed correctly
¾ Sediment builds up on the surface of systems.
¾ The vegetation dies off.
¾ Pondage of water is in excess of one hour.
¾ E rosion occurs.
¾ Pondage of water occurs at every minor rainfall event.
¾ Weed growth occurs.
Corrective Action Contractor to amend installation to ensure it complies with Operational Works
drawings.
The Contractor will check up stream sediment control and fix failures. The
sediment build up will be shovelled off the non-woven geotextile of the
Bioretention systems. The geotextile will be replaced at the beginning of the
defects liability period
Unsuccessful plantings will be replaced as required. A normal allowance of 10%
C
1209 Animal Husbandry – Top Forestry Rd, Ridgewood SWQMP_REV_3
SEPTEMBER 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.